If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0404240516002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.416386,"lon":-113.416703,"icon":""}]} |
| Location: 00/16-05-040-24W4/2 | |
| Location Alias: 00/16-05-40-24 W4M | |
| Location Alias 2: 00/16-05-040-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 05 | |
| County/Municipality: Lacombe County | |
| Well Name: EMBER ET AL CLIVE 16-5-40-24 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0360072 | |
| License Date: 2006-07-12 | |
| License Status: Issued | |
| Spud Date: 2006-08-09 | |
| Final Drill Date: 2006-08-12 | |
| Well Total Depth: 887.00 m | |
| Surface Hole Latitude: 52.416386 | |
| Surface Hole Longitude: -113.416703 |
| Date | Event |
|---|---|
| 2006-07-12 | Obtained License |
| 2006-08-10 | Surface Casing Operation Performed |
| 2006-08-12 | Finished Drilling |
| 2006-08-12 | Production Casing Operation Performed |
| 2006-08-12 | Rig Released |
| 2006-08-12 | Well Mode changed to Drilled and Cased |
| 2006-09-07 | Well Log Performed |
| 2006-09-28 | Perforation Treatment Performed - Jet Perforation |
| 2006-09-30 | Well Log Performed |
| 2006-10-07 | Perforation Treatment Performed - Jet Perforation |
| 2006-10-07 | Well Log Performed |
| 2006-11-09 | Perforation Treatment Performed - Fractured |
| 2006-11-11 | Well Began Production |
| 2006-11-11 | Well Fluid changed to Gas |
| 2006-11-11 | Well Mode changed to Flowing |
| 2006-11-12 | Well Structure changed to Commingled |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-09-28 | Perforation | 846.00 | 848.00 | 17 |
| 2006-10-07 | Perforation | 510.50 | 511.00 | 17 |
| 2006-10-07 | Perforation | 508.70 | 509.20 | 17 |
| 2006-10-07 | Perforation | 484.00 | 486.00 | 17 |
| 2006-10-07 | Perforation | 471.00 | 472.00 | 17 |
| 2006-10-07 | Perforation | 464.50 | 465.00 | 17 |
| 2006-10-07 | Perforation | 460.50 | 461.00 | 17 |
| 2006-10-07 | Perforation | 458.00 | 458.50 | 17 |
| 2006-10-07 | Perforation | 438.50 | 439.00 | 17 |
| 2006-10-07 | Perforation | 434.50 | 436.00 | 17 |
| 2006-10-07 | Perforation | 423.00 | 424.50 | 17 |
| 2006-09-28 | Perforation | 795.00 | 798.00 | 17 |
| 2006-10-07 | Perforation | 419.00 | 420.00 | 17 |
| 2006-10-07 | Perforation | 415.00 | 415.50 | 17 |
| 2006-10-07 | Perforation | 410.00 | 410.50 | 17 |
| 2006-10-07 | Perforation | 371.70 | 372.20 | 17 |
| 2006-10-07 | Perforation | 324.50 | 325.00 | 17 |
| 2006-10-07 | Perforation | 316.00 | 316.50 | 17 |
| 2006-10-07 | Perforation | 299.80 | 300.30 | 17 |
| 2006-11-09 | Fracture | 299.80 | 300.30 | 0 |
| 2006-11-09 | Fracture | 316.00 | 316.50 | 0 |
| 2006-11-09 | Fracture | 324.50 | 325.00 | 0 |
| 2006-09-28 | Perforation | 791.00 | 793.00 | 17 |
| 2006-11-09 | Fracture | 371.70 | 372.20 | 0 |
| 2006-11-09 | Fracture | 410.00 | 410.50 | 0 |
| 2006-11-09 | Fracture | 415.00 | 415.50 | 0 |
| 2006-11-09 | Fracture | 419.00 | 420.00 | 0 |
| 2006-11-09 | Fracture | 434.50 | 436.00 | 0 |
| 2006-11-09 | Fracture | 458.00 | 458.50 | 0 |
| 2006-11-09 | Fracture | 460.50 | 461.00 | 0 |
| 2006-11-09 | Fracture | 464.50 | 465.00 | 0 |
| 2006-11-09 | Fracture | 471.00 | 472.00 | 0 |
| 2006-11-09 | Fracture | 484.00 | 486.00 | 0 |
| 2006-10-07 | Perforation | 546.30 | 547.30 | 17 |
| 2006-11-09 | Fracture | 508.70 | 509.20 | 0 |
| 2006-11-09 | Fracture | 510.50 | 511.00 | 0 |
| 2006-11-09 | Fracture | 518.00 | 519.00 | 0 |
| 2006-11-09 | Fracture | 524.00 | 525.00 | 0 |
| 2006-11-09 | Fracture | 528.00 | 529.00 | 0 |
| 2006-11-09 | Fracture | 539.50 | 540.00 | 0 |
| 2006-11-09 | Fracture | 541.50 | 543.50 | 0 |
| 2006-11-09 | Fracture | 791.00 | 793.00 | 0 |
| 2006-11-09 | Fracture | 846.00 | 848.00 | 0 |
| 2006-10-07 | Perforation | 541.50 | 543.50 | 17 |
| 2006-10-07 | Perforation | 539.50 | 540.00 | 17 |
| 2006-10-07 | Perforation | 528.00 | 529.00 | 17 |
| 2006-10-07 | Perforation | 524.00 | 525.00 | 17 |
| 2006-10-07 | Perforation | 518.00 | 519.00 | 17 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2006-11-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]