X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240308000

Well Details

Well ID: 0404240308000
Loading map...
Location: 00/08-03-040-24W4/0
Location Alias: 00/08-03-40-24 W4M
Location Alias 2: 00/08-03-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 03
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 8-3-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0031282
License Date: 1966-11-15
License Status: Suspension
Spud Date: 1966-11-21
Final Drill Date: 1966-12-06
Well Total Depth: 1902.00 m
Surface Hole Latitude: 52.410571
Surface Hole Longitude: -113.365590

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-11-15 Obtained License
1966-12-06 Finished Drilling
1966-12-06 Well Mode changed to Drilled and Cased
1966-12-07 Drill Stem Test Performed
1966-12-07 Production Casing Operation Performed
1966-12-09 Perforation Treatment Performed - Jet Perforation
1966-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-12-14 Well Began Production
1966-12-14 Well Fluid changed to Crude Oil
1966-12-14 Well Mode changed to Flowing
1977-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-08 Well Fluid changed to Crude Oil
1979-08-08 Well Mode changed to Abandoned Zone
1998-11-01 Well Log Performed
1998-11-04 Perforation Treatment Performed - Cement Squeeze
1998-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-08 Well Log Performed
1998-11-09 Well Log Performed
1998-11-10 Perforation Treatment Performed - Jet Perforation
1998-11-10 Well Log Performed
1998-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-11 Well Log Performed
1998-11-12 Well Log Performed
2003-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-28 Plug Back Performed
2003-06-28 Well Log Performed
2003-06-29 Perforation Treatment Performed - Jet Perforation
2003-06-29 Well Log Performed
2019-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-20 Perforation Treatment Performed - Cement Plug
2019-11-20 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-12-09 Perforation 1878.20 1879.10 13
1998-11-11 Acid Treatment 1844.00 1881.10 0
2003-06-28 Packing Device Capped w/Cement 1830.00 1838.00 0
2003-06-29 Perforation 1432.50 1437.00 14
2019-11-20 Cement Plug 1748.00 1830.00 0
2019-11-20 Packing Device Capped w/Cement 1422.00 1430.00 0
1966-12-09 Perforation 1836.70 1837.30 13
1966-12-11 Acid Treatment 1836.70 1879.10 0
1977-03-09 Acid Treatment 1878.20 1879.10 0
1977-03-09 Acid Treatment 1836.70 1837.30 0
1979-08-08 Packing Device Capped w/Cement 1845.00 1851.40 0
1998-11-04 Cement Squeeze 1836.70 1837.30 0
1998-11-08 Packing Device Capped w/Cement 1860.00 1868.00 0
1998-11-10 Perforation 1844.00 1881.10 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 1522 0.0 0.0 0.0
1968 1414 0.0 0.0 0.0
1969 2138 0.0 0.0 0.0
1970 1188 0.0 0.0 0.0
1972 3315 0.0 0.0 0.0
1973 6656 0.0 0.0 0.0
1975 3628 0.0 0.0 0.0
1976 5780 0.0 0.0 0.0
1977 6586 0.0 0.0 0.0
1978 8387 0.0 0.0 0.0
1979 3472 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References