If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404240214000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.41782,"lon":-113.354361,"icon":""}]} |
Location: 00/14-02-040-24W4/0 | |
Location Alias: 00/14-02-40-24 W4M | |
Location Alias 2: 00/14-02-040-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 24 | |
Section: 02 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 14-2-40-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0107841 | |
License Date: 1984-06-22 | |
License Status: Suspension | |
Spud Date: 1984-08-10 | |
Final Drill Date: 1984-08-22 | |
Well Total Depth: 1960.00 m | |
Surface Hole Latitude: 52.417820 | |
Surface Hole Longitude: -113.354361 |
Date | Event |
---|---|
1984-06-22 | Obtained License |
1984-08-10 | Lost Circulation Occurred |
1984-08-11 | Surface Casing Operation Performed |
1984-08-22 | Finished Drilling |
1984-08-22 | Well Log Performed |
1984-08-22 | Well Mode changed to Drilled and Cased |
1984-08-23 | Well Log Performed |
1984-08-24 | Production Casing Operation Performed |
1984-08-24 | Rig Released |
1984-10-31 | Well Log Performed |
1984-11-01 | Perforation Treatment Performed - Jet Perforation |
1984-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-11-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-11-03 | Perforation Treatment Performed - Jet Perforation |
1984-11-07 | Perforation Treatment Performed - Cement Squeeze |
1984-11-09 | Perforation Treatment Performed - Jet Perforation |
1984-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-11-26 | Well Began Production |
1984-11-26 | Well Fluid changed to Crude Oil |
1984-11-26 | Well Mode changed to Pumping |
1992-02-06 | Perforation Treatment Performed - Cement Squeeze |
1992-02-06 | Plug Back Performed |
1992-02-06 | Well Fluid changed to Crude Oil |
1992-02-06 | Well Mode changed to Pumping |
1992-02-13 | Perforation Treatment Performed - Jet Perforation |
1992-02-13 | Well Log Performed |
1992-02-14 | Perforation Treatment Performed - Jet Perforation |
1993-05-01 | Well Fluid changed to Crude Oil |
1993-05-01 | Well Mode changed to Suspended |
2003-01-05 | Perforation Treatment Performed - Jet Perforation |
2003-01-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-07-20 | Perforation Treatment Performed - Bridge Plug No Cement Required |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-11-01 | Perforation | 1922.00 | 1922.50 | 13 |
1992-02-14 | Perforation | 1916.00 | 1917.50 | 16 |
2003-01-05 | Perforation | 1915.00 | 1917.50 | 17 |
2003-01-05 | Perforation | 1909.00 | 1911.50 | 17 |
2003-01-07 | Acid Treatment | 1909.00 | 1917.50 | 0 |
2005-07-20 | Bridge Plug, No Cement | 1904.50 | 1905.50 | 0 |
1984-11-02 | Acid Treatment | 1922.00 | 1922.50 | 0 |
1984-11-03 | Perforation | 1881.70 | 1883.00 | 13 |
1984-11-03 | Acid Treatment | 1881.70 | 1883.00 | 0 |
1984-11-07 | Cement Squeeze | 1881.70 | 1883.00 | 0 |
1984-11-09 | Perforation | 1880.20 | 1880.70 | 7 |
1984-11-10 | Acid Treatment | 1880.20 | 1880.70 | 0 |
1992-02-06 | Cement Squeeze | 1880.20 | 1922.50 | 0 |
1992-02-13 | Perforation | 1916.00 | 1917.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 794 | 0.0 | 0.0 | 0.0 |
1985 | 8478 | 0.0 | 0.0 | 0.0 |
1986 | 8380 | 0.0 | 0.0 | 0.0 |
1987 | 8440 | 0.0 | 0.0 | 0.0 |
1988 | 8717 | 0.0 | 0.0 | 0.0 |
1989 | 8295 | 0.0 | 0.0 | 0.0 |
1990 | 8427 | 0.0 | 0.0 | 0.0 |
1991 | 3956 | 0.0 | 0.0 | 0.0 |
1992 | 6957 | 0.0 | 0.0 | 0.0 |
1993 | 2868 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-08-10 | Lost Circulation | 24.00 | 24.00 |
For data sources see[6]