If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404240211002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.413847,"lon":-113.354052,"icon":""}]} |
Location: 00/11-02-040-24W4/2 | |
Location Alias: 00/11-02-40-24 W4M | |
Location Alias 2: 00/11-02-040-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 24 | |
Section: 02 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 11-2-40-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0118954 | |
License Date: 1985-11-05 | |
License Status: Suspension | |
Spud Date: 1985-11-11 | |
Final Drill Date: 1985-11-23 | |
Well Total Depth: 1950.00 m | |
Surface Hole Latitude: 52.413847 | |
Surface Hole Longitude: -113.354052 |
Date | Event |
---|---|
1985-11-05 | Obtained License |
1985-11-13 | Surface Casing Operation Performed |
1985-11-23 | Finished Drilling |
1985-11-23 | Well Mode changed to Drilled and Cased |
1985-11-24 | Well Log Performed |
1985-11-25 | Drill Stem Test Performed |
1985-11-27 | Lost Circulation Occurred |
1985-11-28 | Drill Stem Test Performed |
1985-11-29 | Drill Stem Test Performed |
1985-12-01 | Production Casing Operation Performed |
1985-12-01 | Rig Released |
1986-02-11 | Well Log Performed |
1986-02-12 | Perforation Treatment Performed - Jet Perforation |
1986-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-13 | Well Log Performed |
1986-02-14 | Perforation Treatment Performed - Jet Perforation |
1986-02-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-07 | Well Began Production |
1986-03-07 | Well Fluid changed to Crude Oil |
1986-03-07 | Well Mode changed to Pumping |
1986-03-13 | Perforation Treatment Performed - Cement Squeeze |
1986-10-01 | Perforation Treatment Performed - Jet Perforation |
1986-10-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-01-26 | Well Log Performed |
1995-01-27 | Perforation Treatment Performed - Cement Squeeze |
1995-01-27 | Plug Back Performed |
1995-01-27 | Well Fluid changed to Crude Oil |
1995-01-27 | Well Mode changed to Abandoned Zone |
1995-01-31 | Perforation Treatment Performed - Jet Perforation |
1995-01-31 | Well Log Performed |
1995-02-02 | Perforation Treatment Performed - Cement Plug |
1995-02-02 | Perforation Treatment Performed - Jet Perforation |
1995-02-02 | Plug Back Performed |
1995-02-02 | Well Log Performed |
1995-02-06 | Perforation Treatment Performed - Jet Perforation |
1995-02-06 | Well Log Performed |
1995-02-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-02-10 | Perforation Treatment Performed - Jet Perforation |
1995-02-10 | Well Log Performed |
1995-02-15 | Perforation Treatment Performed - Cement Plug |
1995-02-15 | Plug Back Performed |
1995-02-15 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-02-12 | Perforation | 1902.50 | 1903.50 | 13 |
1995-01-27 | Cement Squeeze | 1875.00 | 1875.50 | 0 |
1995-01-27 | Cement Squeeze | 1902.50 | 1903.50 | 0 |
1995-01-31 | Perforation | 1895.00 | 1895.50 | 17 |
1995-02-02 | Cement Plug | 1885.00 | 1893.00 | 0 |
1995-02-02 | Perforation | 1860.00 | 1863.50 | 17 |
1995-02-06 | Perforation | 1850.50 | 1855.50 | 17 |
1995-02-08 | Acid Treatment | 1850.50 | 1855.50 | 0 |
1995-02-10 | Perforation | 1850.50 | 1855.50 | 17 |
1995-02-10 | Acid Treatment | 1850.50 | 1855.50 | 0 |
1995-02-15 | Cement Plug | 1840.50 | 1848.50 | 0 |
1986-02-13 | Acid Treatment | 1902.50 | 1903.50 | 0 |
1986-02-14 | Perforation | 1875.00 | 1875.50 | 13 |
1986-02-14 | Perforation | 1866.00 | 1866.50 | 13 |
1986-02-15 | Acid Treatment | 1866.00 | 1875.50 | 0 |
1986-03-13 | Cement Squeeze | 1866.00 | 1866.50 | 0 |
1986-10-01 | Perforation | 1875.00 | 1875.50 | 7 |
1986-10-02 | Acid Treatment | 1875.00 | 1903.50 | 0 |
1992-10-29 | Acid Treatment | 1875.00 | 1903.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 5907 | 0.0 | 0.0 | 0.0 |
1987 | 8416 | 0.0 | 0.0 | 0.0 |
1988 | 8627 | 0.0 | 0.0 | 0.0 |
1989 | 8167 | 0.0 | 0.0 | 0.0 |
1990 | 8229 | 0.0 | 0.0 | 0.0 |
1991 | 7917 | 0.0 | 0.0 | 0.0 |
1992 | 3120 | 0.0 | 0.0 | 0.0 |
1993 | 8266 | 0.0 | 0.0 | 0.0 |
1994 | 8656 | 0.0 | 0.0 | 0.0 |
1995 | 464 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1985-11-27 | Lost Circulation | 1950.00 | 1950.00 |
For data sources see[6]