X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240210002

Well Details

Well ID: 0404240210002
Loading map...
Location: 00/10-02-040-24W4/2
Location Alias: 00/10-02-40-24 W4M
Location Alias 2: 00/10-02-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 02
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 10-2-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0028192
License Date: 1965-05-10
License Status: Suspension
Spud Date: 1965-05-23
Final Drill Date: 1965-06-08
Well Total Depth: 1922.40 m
Surface Hole Latitude: 52.414747
Surface Hole Longitude: -113.349268

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-05-10 Obtained License
1965-06-08 Finished Drilling
1965-06-08 Well Mode changed to Drilled and Cased
1965-06-10 Drill Stem Test Performed
1965-06-11 Drill Stem Test Performed
1965-06-12 Drill Stem Test Performed
1965-06-13 Production Casing Operation Performed
1965-07-20 Perforation Treatment Performed - Bullet Perforation
1965-07-22 Perforation Treatment Performed - Acid Wash - No Pressure
1965-07-25 Perforation Treatment Performed - Acid Wash - No Pressure
1965-07-25 Perforation Treatment Performed - Jet Perforation
1965-07-26 Well Began Production
1965-07-26 Well Fluid changed to Crude Oil
1965-07-26 Well Mode changed to Flowing
1988-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-13 Well Fluid changed to Crude Oil
1988-09-13 Well Mode changed to Pumping
1992-08-18 Well Log Performed
1992-08-19 Perforation Treatment Performed - Cement Squeeze
1992-08-20 Perforation Treatment Performed - Jet Perforation
1992-08-21 Perforation Treatment Performed - Jet Perforation
1992-08-21 Well Log Performed
1992-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-11 Well Log Performed
1997-05-12 Perforation Treatment Performed - Cement Squeeze
1997-05-15 Perforation Treatment Performed - Jet Perforation
1997-05-15 Well Log Performed
1997-06-01 Well Fluid changed to Crude Oil
1997-06-01 Well Mode changed to Suspended
2001-04-25 Well Log Performed
2001-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-29 Plug Back Performed
2001-04-29 Well Fluid changed to Crude Oil
2001-04-29 Well Log Performed
2001-04-29 Well Mode changed to Suspended
2001-04-30 Perforation Treatment Performed - Jet Perforation
2001-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-25 Well Fluid changed to Crude Oil
2001-05-25 Well Mode changed to Pumping
2004-09-29 Perforation Treatment Performed - Jet Perforation
2004-09-29 Well Log Performed
2004-10-01 Well Log Performed
2004-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-10-03 Perforation Treatment Performed - Jet Perforation
2004-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-05 Plug Back Performed
2004-10-05 Well Fluid changed to Crude Oil
2004-10-05 Well Mode changed to Abandoned Zone
2004-10-06 Well Log Performed
2005-11-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-20 Bullet Perforation 1917.80 1918.40 10
1997-05-12 Cement Squeeze 1908.00 1909.50 0
1997-05-15 Perforation 1900.00 1904.00 18
2001-04-29 Packing Device Capped w/Cement 1887.00 1895.00 0
2001-04-30 Perforation 1865.00 1870.00 17
2001-05-01 Acid Treatment 1865.00 1870.00 0
2004-09-29 Perforation 1882.00 1884.00 17
2004-10-02 Acid Treatment 1882.00 1884.00 0
2004-10-03 Perforation 1860.00 1862.00 17
2004-10-05 Packing Device Capped w/Cement 1844.00 1852.00 0
1965-07-22 Acid Wash 1917.80 1918.40 0
1965-07-25 Perforation 1878.80 1880.30 7
1965-07-25 Acid Wash 1878.80 1880.30 0
1988-04-28 Acid Treatment 1917.80 1918.40 0
1992-08-19 Cement Squeeze 1917.80 1918.40 0
1992-08-20 Perforation 1908.00 1909.50 18
1992-08-21 Perforation 1876.30 1878.10 18
1992-08-24 Acid Treatment 1876.30 1880.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4573 0.0 0.0 0.0
1968 4747 0.0 0.0 0.0
1969 3923 0.0 0.0 0.0
1970 3578 0.0 0.0 0.0
1971 6008 0.0 0.0 0.0
1972 7956 0.0 0.0 0.0
1973 8033 0.0 0.0 0.0
1974 5846 0.0 0.0 0.0
1975 8016 0.0 0.0 0.0
1976 8486 0.0 0.0 0.0
1977 8347 0.0 0.0 0.0
1978 8453 0.0 0.0 0.0
1979 8103 0.0 0.0 0.0
1980 7799 0.0 0.0 0.0
1981 8639 0.0 0.0 0.0
1982 8399 0.0 0.0 0.0
1983 8128 0.0 0.0 0.0
1984 8278 0.0 0.0 0.0
1985 8645 0.0 0.0 0.0
1986 8108 0.0 0.0 0.0
1987 8452 0.0 0.0 0.0
1988 8520 0.0 0.0 0.0
1989 8407 0.0 0.0 0.0
1990 8212 0.0 0.0 0.0
1991 8113 0.0 0.0 0.0
1992 8021 0.0 0.0 0.0
1993 8338 0.0 0.0 0.0
1994 8580 0.0 0.0 0.0
1995 8383 0.0 0.0 0.0
1996 8635 0.0 0.0 0.0
1997 2828 0.0 0.0 0.0
2001 4404 0.0 0.0 0.0
2002 1416 0.0 0.0 0.0

For data sources see[5]

References