X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240206002

Well Details

Well ID: 0404240206002
Loading map...
Location: 00/06-02-040-24W4/2
Location Alias: 00/06-02-40-24 W4M
Location Alias 2: 00/06-02-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 02
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 6-2-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0101467
License Date: 1983-05-30
License Status: Suspension
Spud Date: 1983-06-14
Final Drill Date: 1983-06-30
Well Total Depth: 1924.00 m
Surface Hole Latitude: 52.410579
Surface Hole Longitude: -113.354358

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-05-30 Obtained License
1983-06-30 Finished Drilling
1983-06-30 Well Mode changed to Drilled and Cased
1983-07-02 Drill Stem Test Performed
1983-07-03 Drill Stem Test Performed
1983-07-04 Drill Stem Test Performed
1983-07-06 Drill Stem Test Performed
1983-07-08 Production Casing Operation Performed
1983-08-03 Perforation Treatment Performed - Jet Perforation
1983-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-05 Perforation Treatment Performed - Jet Perforation
1983-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-05 Well Began Production
1983-09-05 Well Fluid changed to Crude Oil
1983-09-05 Well Mode changed to Flowing
1989-07-21 Well Fluid changed to Crude Oil
1989-07-21 Well Mode changed to Pumping
1990-10-29 Well Log Performed
1990-11-02 Well Log Performed
1997-07-14 Well Log Performed
1997-07-15 Perforation Treatment Performed - Cement Squeeze
1997-07-15 Well Log Performed
1997-07-17 Perforation Treatment Performed - Jet Perforation
1997-07-17 Well Log Performed
1997-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-21 Perforation Treatment Performed - Jet Perforation
1997-07-21 Well Log Performed
1997-07-22 Perforation Treatment Performed - Cement Squeeze
1997-07-24 Perforation Treatment Performed - Cement Squeeze
1997-07-27 Perforation Treatment Performed - Jet Perforation
1997-07-27 Well Log Performed
1997-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-01 Well Fluid changed to Crude Oil
1997-08-01 Well Mode changed to Suspended
1999-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-15 Perforation Treatment Performed - Jet Perforation
1999-01-15 Plug Back Performed
1999-01-15 Well Log Performed
1999-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-22 Well Fluid changed to Crude Oil
1999-01-22 Well Mode changed to Flowing
1999-01-23 Well Fluid changed to Crude Oil
1999-01-23 Well Mode changed to Flowing
2003-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-06 Plug Back Performed
2003-04-06 Well Fluid changed to Crude Oil
2003-04-06 Well Mode changed to Abandoned Zone
2003-04-07 Perforation Treatment Performed - Jet Perforation
2020-01-21 Well Log Performed
2020-01-22 Perforation Treatment Performed - Cement Plug
2020-01-22 Plug Back Performed
2020-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-23 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-03 Perforation 1888.30 1889.30 14
1997-07-24 Cement Squeeze 1855.00 1857.00 0
1997-07-27 Perforation 1872.50 1875.00 17
1997-07-28 Acid Treatment 1872.50 1875.00 0
1999-01-15 Packing Device Capped w/Cement 1858.00 1866.00 0
1999-01-15 Perforation 1838.00 1841.00 13
1999-01-17 Acid Treatment 1838.00 1841.00 0
2003-04-06 Packing Device Capped w/Cement 1827.00 1835.00 0
2003-04-07 Perforation 1444.00 1447.00 20
2020-01-22 Cement Plug 1772.00 1827.00 0
2020-01-23 Packing Device Capped w/Cement 1432.00 1440.00 0
1983-08-04 Acid Treatment 1888.30 1889.30 0
1983-08-05 Perforation 1855.00 1857.00 13
1983-08-06 Acid Treatment 1855.00 1857.00 0
1997-07-15 Cement Squeeze 1888.30 1889.30 0
1997-07-17 Perforation 1872.50 1877.00 17
1997-07-20 Acid Treatment 1872.50 1877.00 0
1997-07-21 Perforation 1881.00 1881.30 99
1997-07-22 Cement Squeeze 1881.00 1881.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2474 0.0 0.0 0.0
1984 8186 0.0 0.0 0.0
1985 8664 0.0 0.0 0.0
1986 8464 0.0 0.0 0.0
1987 8223 0.0 0.0 0.0
1988 8747 0.0 0.0 0.0
1989 7853 0.0 0.0 0.0
1990 8343 0.0 0.0 0.0
1991 8101 0.0 0.0 0.0
1992 8520 0.0 0.0 0.0
1993 8195 0.0 0.0 0.0
1994 8644 0.0 0.0 0.0
1995 8067 0.0 0.0 0.0
1996 8569 0.0 0.0 0.0
1997 3637 0.0 0.0 0.0
1999 7958 0.0 0.0 0.0
2000 4569 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-22 No Incident Encountered 0.00 0.00
2020-01-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References