X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240205000

Well Details

Well ID: 0404240205000
Loading map...
Location: 00/05-02-040-24W4/0
Location Alias: 00/05-02-40-24 W4M
Location Alias 2: 00/05-02-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 02
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 5-2-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0154267
License Date: 1992-10-28
License Status: Suspension
Spud Date: 1992-11-29
Final Drill Date: 1992-12-07
Well Total Depth: 1900.00 m
Surface Hole Latitude: 52.410571
Surface Hole Longitude: -113.358826

For data sources see[1][2]

Well History

Date Event
1992-10-28 Obtained License
1992-11-29 Surface Casing Operation Performed
1992-12-07 Finished Drilling
1992-12-07 Well Mode changed to Drilled and Cased
1992-12-08 Well Log Performed
1992-12-10 Production Casing Operation Performed
1992-12-10 Rig Released
1992-12-16 Well Log Performed
1992-12-17 Perforation Treatment Performed - Jet Perforation
1992-12-17 Well Log Performed
1992-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-20 Well Began Production
1992-12-20 Well Fluid changed to Crude Oil
1992-12-20 Well Mode changed to Flowing
1992-12-22 Perforation Treatment Performed - Jet Perforation
1992-12-22 Well Log Performed
1993-01-04 Perforation Treatment Performed - Cement Squeeze
1993-01-07 Perforation Treatment Performed - Jet Perforation
1993-01-07 Well Log Performed
1993-01-11 Perforation Treatment Performed - Cement Squeeze
1993-01-14 Perforation Treatment Performed - Jet Perforation
1993-01-14 Well Log Performed
1993-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-20 Perforation Treatment Performed - Cement Squeeze
1993-01-22 Perforation Treatment Performed - Jet Perforation
1993-01-22 Well Log Performed
1993-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-27 Perforation Treatment Performed - Cement Squeeze
1993-01-27 Plug Back Performed
1993-01-27 Well Fluid changed to Crude Oil
1993-01-27 Well Mode changed to Pumping
2008-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-29 Plug Back Performed
2008-07-29 Well Fluid changed to Crude Oil
2008-07-29 Well Log Performed
2008-07-29 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-17 Perforation 1875.50 1876.50 17
1993-01-22 Perforation 1834.00 1836.00 17
1993-01-25 Acid Treatment 1834.00 1836.00 0
1993-01-27 Cement Squeeze 1834.00 1836.00 0
2008-07-29 Packing Device Capped w/Cement 1862.00 1870.00 0
1992-12-18 Acid Treatment 1875.50 1876.50 0
1992-12-22 Perforation 1842.00 1844.00 17
1993-01-04 Cement Squeeze 1842.00 1844.00 0
1993-01-07 Perforation 1838.00 1839.50 17
1993-01-11 Cement Squeeze 1838.00 1839.50 0
1993-01-14 Perforation 1834.00 1837.00 17
1993-01-15 Acid Treatment 1834.00 1837.00 0
1993-01-20 Cement Squeeze 1834.00 1837.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1 0.0 0.0 0.0
1993 7311 0.0 0.0 0.0
1994 8720 0.0 0.0 0.0
1995 8089 0.0 0.0 0.0
1996 8591 0.0 0.0 0.0
1997 8071 0.0 0.0 0.0
1998 6124 0.0 0.0 0.0
1999 1476 0.0 0.0 0.0

For data sources see[5]

References