X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240104002

Well Details

Well ID: 0404240104002
Loading map...
Location: 00/04-01-040-24W4/2
Location Alias: 00/04-01-40-24 W4M
Location Alias 2: 00/04-01-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 01
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 4-1-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030688
License Date: 1966-07-13
License Status: Suspension
Spud Date: 1966-07-29
Final Drill Date: 1966-08-08
Well Total Depth: 1949.50 m
Surface Hole Latitude: 52.407001
Surface Hole Longitude: -113.336244

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-13 Obtained License
1966-08-08 Finished Drilling
1966-08-08 Well Mode changed to Drilled and Cased
1966-08-09 Production Casing Operation Performed
1966-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-08-19 Perforation Treatment Performed - Acid Wash - No Pressure
1966-08-19 Perforation Treatment Performed - Jet Perforation
1966-08-31 Perforation Treatment Performed - Acid Wash - No Pressure
1966-08-31 Perforation Treatment Performed - Jet Perforation
1966-09-02 Well Began Production
1966-09-02 Well Fluid changed to Crude Oil
1966-09-02 Well Mode changed to Flowing
1987-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-12-16 Plug Back Performed
1987-12-16 Well Fluid changed to Crude Oil
1987-12-16 Well Mode changed to Flowing
1988-09-13 Well Fluid changed to Crude Oil
1988-09-13 Well Mode changed to Pumping
2003-01-12 Perforation Treatment Performed - Cement Squeeze
2003-01-18 Perforation Treatment Performed - Jet Perforation
2003-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-21 Perforation Treatment Performed - Jet Perforation
2003-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-01-25 Perforation Treatment Performed - Bridge Plug No Cement Required
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-19 Perforation 1906.50 1907.70 7
2003-01-21 Packing Device Capped w/Cement 1892.00 1900.00 0
2003-01-21 Perforation 1871.00 1874.00 17
2003-01-21 Perforation 1867.80 1870.00 17
2003-01-21 Perforation 1865.40 1866.40 17
2003-01-23 Acid Treatment 1865.40 1874.00 0
2003-01-25 Bridge Plug, No Cement 1870.40 1870.90 0
1966-08-19 Acid Wash 1906.50 1907.70 0
1966-08-19 Acid Treatment 1906.50 1907.70 0
1966-08-31 Perforation 1875.10 1876.30 7
1966-08-31 Acid Wash 1875.10 1907.70 0
1987-12-16 Packing Device Capped w/Cement 1896.20 1896.20 0
2003-01-12 Cement Squeeze 1875.10 1876.30 0
2003-01-18 Perforation 1914.70 1916.00 17
2003-01-20 Acid Treatment 1914.70 1916.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 5128 0.0 0.0 0.0
1968 4673 0.0 0.0 0.0
1969 4634 0.0 0.0 0.0
1970 3576 0.0 0.0 0.0
1971 5 0.0 0.0 0.0
1972 6 0.0 0.0 0.0
1973 6 0.0 0.0 0.0
1974 24 0.0 0.0 0.0
1975 24 0.0 0.0 0.0
1976 2998 0.0 0.0 0.0
1979 4566 0.0 0.0 0.0
1980 8355 0.0 0.0 0.0
1981 8735 0.0 0.0 0.0
1982 8393 0.0 0.0 0.0
1983 8735 0.0 0.0 0.0
1984 8455 0.0 0.0 0.0
1985 8591 0.0 0.0 0.0
1986 8484 0.0 0.0 0.0
1987 8129 0.0 0.0 0.0
1988 8375 0.0 0.0 0.0
1989 7889 0.0 0.0 0.0
1990 8488 0.0 0.0 0.0
1991 8224 0.0 0.0 0.0
1992 8254 0.0 0.0 0.0
1993 7966 0.0 0.0 0.0
1994 8565 0.0 0.0 0.0
1995 8210 0.0 0.0 0.0
1996 8344 0.0 0.0 0.0
1997 7575 0.0 0.0 0.0
1998 4007 0.0 0.0 0.0
2003 1435 0.0 0.0 0.0

For data sources see[5]

References