If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404230815022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.43064,"lon":-113.27359,"icon":""}]} |
Location: 02/15-08-040-23W4/2 | |
Location Alias: 02/15-08-40-23 W4M | |
Location Alias 2: 02/15-08-040-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 23 | |
Section: 08 | |
County/Municipality: Lacombe County | |
Well Name: EMBER 102 NEVIS 15-8-40-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0226082 | |
License Date: 1999-09-08 | |
License Status: Issued | |
Spud Date: 1999-09-17 | |
Final Drill Date: 1999-09-18 | |
Well Total Depth: 865.00 m | |
Surface Hole Latitude: 52.430640 | |
Surface Hole Longitude: -113.273590 |
Date | Event |
---|---|
1999-09-08 | Obtained License |
1999-09-18 | Finished Drilling |
1999-09-18 | Well Log Performed |
1999-09-18 | Well Mode changed to Drilled and Cased |
1999-09-19 | Production Casing Operation Performed |
1999-09-19 | Rig Released |
1999-09-23 | Perforation Treatment Performed - Jet Perforation |
1999-09-23 | Well Log Performed |
1999-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-07 | Perforation Treatment Performed - Jet Perforation |
1999-10-07 | Plug Back Performed |
1999-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-14 | Perforation Treatment Performed - Jet Perforation |
1999-10-14 | Plug Back Performed |
1999-10-28 | Perforation Treatment Performed - Chemical Squeeze |
1999-11-19 | Perforation Treatment Performed - Fractured |
1999-11-26 | Perforation Treatment Performed - Jet Perforation |
1999-11-26 | Well Mode changed to Drilled and Cased |
1999-11-29 | Perforation Treatment Performed - Fractured |
1999-12-14 | Well Began Production |
1999-12-14 | Well Fluid changed to Gas |
1999-12-14 | Well Mode changed to Flowing |
2006-11-24 | Well Log Performed |
2006-11-25 | Perforation Treatment Performed - Cement Squeeze |
2006-11-25 | Plug Back Performed |
2006-11-25 | Well Fluid changed to Gas |
2006-11-25 | Well Mode changed to Abandoned Zone |
2006-12-02 | Perforation Treatment Performed - Jet Perforation |
2006-12-02 | Well Log Performed |
2006-12-04 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-09-23 | Perforation | 631.50 | 635.50 | 20 |
2006-11-25 | Cement Squeeze | 429.00 | 433.00 | 0 |
2006-12-02 | Perforation | 258.50 | 259.00 | 13 |
2006-12-02 | Perforation | 268.20 | 269.30 | 13 |
2006-12-02 | Perforation | 295.20 | 297.20 | 13 |
2006-12-02 | Perforation | 358.00 | 359.00 | 13 |
2006-12-02 | Perforation | 362.80 | 363.30 | 13 |
2006-12-02 | Perforation | 367.50 | 368.00 | 13 |
2006-12-02 | Perforation | 372.50 | 373.50 | 13 |
2006-12-02 | Perforation | 378.80 | 379.30 | 13 |
2006-12-02 | Perforation | 383.00 | 383.50 | 13 |
1999-10-07 | Packing Device Capped w/Cement | 622.00 | 630.00 | 0 |
2006-12-02 | Perforation | 399.80 | 400.30 | 13 |
2006-12-02 | Perforation | 406.00 | 406.50 | 13 |
2006-12-02 | Perforation | 412.00 | 413.00 | 13 |
2006-12-02 | Perforation | 425.80 | 428.30 | 13 |
2006-12-02 | Perforation | 449.20 | 450.70 | 13 |
2006-12-02 | Perforation | 462.80 | 463.30 | 13 |
2006-12-02 | Perforation | 465.00 | 466.00 | 13 |
2006-12-02 | Perforation | 479.00 | 481.50 | 13 |
2006-12-02 | Perforation | 484.50 | 486.00 | 13 |
2006-12-02 | Perforation | 492.30 | 492.80 | 13 |
1999-10-07 | Perforation | 591.00 | 595.00 | 17 |
2006-12-04 | Fracture | 258.50 | 492.80 | 0 |
1999-10-14 | Packing Device Capped w/Cement | 579.00 | 587.00 | 0 |
1999-10-14 | Perforation | 566.00 | 572.00 | 18 |
1999-10-28 | Chemical Squeeze | 566.00 | 572.00 | 0 |
1999-11-19 | Fracture | 566.00 | 572.00 | 0 |
1999-11-26 | Perforation | 429.00 | 433.00 | 17 |
1999-11-29 | Fracture | 429.00 | 433.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 264 | 0.0 | 0.0 | 0.0 |
2000 | 8679 | 0.0 | 0.0 | 0.0 |
2001 | 8741 | 0.0 | 0.0 | 0.0 |
2002 | 8549 | 0.0 | 0.0 | 0.0 |
2003 | 8750 | 0.0 | 0.0 | 0.0 |
2004 | 8767 | 0.0 | 0.0 | 0.0 |
2005 | 8748 | 0.0 | 0.0 | 0.0 |
2006 | 7768 | 0.0 | 0.0 | 0.0 |
For data sources see[5]