X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404230611020

Well Details

Well ID: 0404230611020
Loading map...
Location: 02/11-06-040-23W4/0
Location Alias: 02/11-06-40-23 W4M
Location Alias 2: 02/11-06-040-23 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 23
Section: 06
County/Municipality: Lacombe County
Well Name: FAIRBORNE ALIX 11-6-40-23
Operator Name: Tourmaline Oil Corp.
License Number: 0206362
License Date: 1997-09-19
License Status: Suspension
Spud Date: 1997-09-26
Final Drill Date: 1997-10-02
Well Total Depth: 1840.00 m
Surface Hole Latitude: 52.414331
Surface Hole Longitude: -113.305427

For data sources see[1][2]

Well History

Date Event
1997-09-19 Obtained License
1997-09-27 Surface Casing Operation Performed
1997-10-02 Finished Drilling
1997-10-02 Well Mode changed to Drilled and Cased
1997-10-03 Well Log Performed
1997-10-05 Production Casing Operation Performed
1997-10-05 Rig Released
1997-10-17 Well Log Performed
1997-10-18 Perforation Treatment Performed - Jet Perforation
1997-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-21 Well Began Production
1997-10-21 Well Fluid changed to Crude Oil
1997-10-21 Well Mode changed to Flowing
1998-04-20 Well Log Performed
1998-04-27 Perforation Treatment Performed - Jet Perforation
1998-04-27 Well Log Performed
1998-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-30 Perforation Treatment Performed - Jet Perforation
1998-04-30 Well Log Performed
1998-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-01 Plug Back Performed
1998-06-01 Well Fluid changed to Crude Oil
1998-06-01 Well Log Performed
1998-06-01 Well Mode changed to Abandoned Zone
1998-06-03 Perforation Treatment Performed - Jet Perforation
1998-06-03 Well Log Performed
2019-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-08 Perforation Treatment Performed - Cement Plug
2019-01-08 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-18 Perforation 1801.50 1808.00 16
2019-01-08 Packing Device Capped w/Cement 1552.00 1560.00 0
1997-10-19 Acid Treatment 1801.50 1808.00 0
1998-04-27 Perforation 1810.00 1810.50 13
1998-04-29 Acid Treatment 1810.00 1810.50 0
1998-04-30 Perforation 1810.00 1811.00 13
1998-05-01 Acid Treatment 1810.00 1811.00 0
1998-06-01 Packing Device Capped w/Cement 1788.00 1796.00 0
1998-06-03 Perforation 1564.50 1567.00 20
2019-01-08 Cement Plug 1712.00 1788.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1400 0.0 0.0 0.0
1998 2284 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References