If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404211913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.463849,"lon":-112.999489,"icon":""}]} |
Location: 00/13-19-040-21W4/0 | |
Location Alias: 00/13-19-40-21 W4M | |
Location Alias 2: 00/13-19-040-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 21 | |
Section: 19 | |
County/Municipality: Lacombe County | |
Well Name: EMBER ET AL NEVIS 13-19-40-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0377650 | |
License Date: 2007-05-31 | |
License Status: Issued | |
Spud Date: 2007-06-10 | |
Final Drill Date: 2007-06-22 | |
Well Total Depth: 1718.00 m | |
Surface Hole Latitude: 52.463849 | |
Surface Hole Longitude: -112.999489 |
Date | Event |
---|---|
2007-05-31 | Obtained License |
2007-06-10 | Direction Drilling Operation Performed - Deviate |
2007-06-10 | Direction Drilling Operation Performed - Horizontal |
2007-06-12 | Surface Casing Operation Performed |
2007-06-21 | Direction Drilling Operation Performed - Deviate |
2007-06-22 | Finished Drilling |
2007-06-22 | Production Casing Operation Performed |
2007-06-22 | Well Mode changed to Drilled and Cased |
2007-06-23 | Rig Released |
2007-08-26 | Perforation Treatment Performed - Jet Perforation |
2007-08-27 | Perforation Treatment Performed - Jet Perforation |
2007-08-27 | Well Log Performed |
2007-08-28 | Perforation Treatment Performed - Jet Perforation |
2007-09-07 | Perforation Treatment Performed - Fractured |
2007-09-21 | Well Began Production |
2007-09-21 | Well Fluid changed to Coalbed Methane-Coals Only |
2007-09-21 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-06-10 | 5.00 | Deviate (5 - 79 degrees) |
2007-06-10 | 370.00 | Horizontal |
2007-06-21 | 1387.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-08-26 | Perforation | 1621.80 | 1622.70 | 7 |
2007-08-26 | Perforation | 1395.00 | 1396.00 | 7 |
2007-08-26 | Perforation | 1371.50 | 1374.50 | 7 |
2007-08-26 | Perforation | 1360.00 | 1362.00 | 7 |
2007-08-27 | Perforation | 1354.00 | 1357.00 | 7 |
2007-08-27 | Perforation | 1341.00 | 1342.70 | 7 |
2007-08-27 | Perforation | 1331.00 | 1332.50 | 7 |
2007-08-27 | Perforation | 1171.00 | 1174.00 | 7 |
2007-08-27 | Perforation | 1142.00 | 1145.00 | 7 |
2007-08-27 | Perforation | 1122.00 | 1125.00 | 7 |
2007-08-27 | Perforation | 1095.00 | 1098.00 | 7 |
2007-08-26 | Perforation | 1615.00 | 1616.40 | 7 |
2007-08-27 | Perforation | 1050.00 | 1053.00 | 7 |
2007-08-27 | Perforation | 1035.00 | 1038.00 | 7 |
2007-08-27 | Perforation | 977.00 | 980.00 | 7 |
2007-08-27 | Perforation | 962.00 | 963.00 | 7 |
2007-08-27 | Perforation | 861.00 | 864.00 | 7 |
2007-08-27 | Perforation | 835.00 | 838.00 | 7 |
2007-08-27 | Perforation | 755.50 | 758.50 | 7 |
2007-08-28 | Perforation | 728.00 | 731.00 | 7 |
2007-08-28 | Perforation | 663.00 | 666.00 | 7 |
2007-09-07 | Fracture | 663.00 | 1622.70 | 0 |
2007-08-26 | Perforation | 1595.00 | 1597.00 | 7 |
2007-08-26 | Perforation | 1581.00 | 1583.00 | 7 |
2007-08-26 | Perforation | 1553.00 | 1554.50 | 7 |
2007-08-26 | Perforation | 1518.50 | 1519.80 | 7 |
2007-08-26 | Perforation | 1497.00 | 1499.50 | 7 |
2007-08-26 | Perforation | 1471.50 | 1474.50 | 7 |
2007-08-26 | Perforation | 1441.70 | 1443.00 | 7 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 2328 | 0.0 | 0.0 | 0.0 |
2008 | 8602 | 0.0 | 0.0 | 0.0 |
2009 | 8446 | 0.0 | 0.0 | 0.0 |
2010 | 8469 | 0.0 | 0.0 | 0.0 |
2011 | 8737 | 0.0 | 0.0 | 0.0 |
2012 | 8704 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8754 | 0.0 | 0.0 | 0.0 |
2015 | 8729 | 0.0 | 0.0 | 0.0 |
2016 | 8726 | 0.0 | 0.0 | 0.0 |
2017 | 8429 | 0.0 | 0.0 | 0.0 |
2018 | 8689 | 0.0 | 0.0 | 0.0 |
2019 | 8474 | 0.0 | 0.0 | 0.0 |
2020 | 2058 | 0.0 | 0.0 | 0.0 |
For data sources see[6]