If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404192503002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.4662,"lon":-112.60978,"icon":""}]} |
Location: 00/03-25-040-19W4/2 | |
Location Alias: 00/03-25-40-19 W4M | |
Location Alias 2: 00/03-25-040-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 19 | |
Section: 25 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BAYTEX LEAHURST 3-25-40-19 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0193051 | |
License Date: 1996-11-04 | |
License Status: Abandoned | |
Spud Date: 1996-11-14 | |
Final Drill Date: 1996-11-18 | |
Well Total Depth: 1363.00 m | |
Surface Hole Latitude: 52.466200 | |
Surface Hole Longitude: -112.609780 |
Date | Event |
---|---|
1996-11-04 | Obtained License |
1996-11-14 | Surface Casing Operation Performed |
1996-11-18 | Finished Drilling |
1996-11-18 | Well Mode changed to Drilled and Cased |
1996-11-19 | Well Log Performed |
1996-11-20 | Production Casing Operation Performed |
1996-11-20 | Rig Released |
1996-12-01 | Perforation Treatment Performed - Jet Perforation |
1996-12-02 | Perforation Treatment Performed - Jet Perforation |
1996-12-24 | Well Began Production |
1996-12-24 | Well Fluid changed to Gas |
1996-12-24 | Well Mode changed to Flowing |
1998-09-30 | Well Fluid changed to Gas |
1998-09-30 | Well Mode changed to Suspended |
2000-06-02 | Perforation Treatment Performed - Cement Squeeze |
2000-06-02 | Plug Back Performed |
2000-12-19 | Perforation Treatment Performed - Jet Perforation |
2000-12-19 | Well Log Performed |
2002-06-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-01 | Plug Back Performed |
2002-06-01 | Well Log Performed |
2002-06-02 | Perforation Treatment Performed - Jet Perforation |
2002-06-02 | Well Log Performed |
2002-06-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-03 | Plug Back Performed |
2002-06-03 | Well Fluid changed to Gas |
2002-06-03 | Well Log Performed |
2002-06-03 | Well Mode changed to Abandoned Zone |
2014-03-18 | Well Abandoned |
2014-03-18 | Well Fluid changed to Gas |
2014-03-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-12-01 | Perforation | 1232.30 | 1234.30 | 18 |
1996-12-02 | Perforation | 1265.00 | 1267.00 | 18 |
2000-06-02 | Cement Squeeze | 1232.20 | 1234.20 | 0 |
2000-12-19 | Perforation | 1265.00 | 1267.00 | 17 |
2002-06-01 | Packing Device Capped w/Cement | 1252.00 | 1260.00 | 0 |
2002-06-02 | Perforation | 1233.00 | 1234.00 | 20 |
2002-06-03 | Packing Device Capped w/Cement | 1222.00 | 1230.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 215 | 0.0 | 0.0 | 0.0 |
1997 | 1949 | 0.0 | 0.0 | 0.0 |
For data sources see[5]