If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404190502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.407258,"lon":-112.698082,"icon":""}]} |
Location: 00/02-05-040-19W4/0 | |
Location Alias: 00/02-05-40-19 W4M | |
Location Alias 2: 00/02-05-040-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 19 | |
Section: 05 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BAYTEX LEAHURST 2-5-40-19 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0171061 | |
License Date: 1994-10-03 | |
License Status: Suspension | |
Spud Date: 1994-10-19 | |
Final Drill Date: 1994-10-25 | |
Well Total Depth: 1425.00 m | |
Surface Hole Latitude: 52.407258 | |
Surface Hole Longitude: -112.698082 |
Date | Event |
---|---|
1994-10-03 | Obtained License |
1994-10-19 | Well Log Performed |
1994-10-20 | Surface Casing Operation Performed |
1994-10-22 | Direction Drilling Operation Performed - Deviate |
1994-10-24 | Well Log Performed |
1994-10-25 | Finished Drilling |
1994-10-25 | Well Log Performed |
1994-10-25 | Well Mode changed to Drilled and Cased |
1994-10-26 | Drill Stem Test Performed |
1994-10-27 | Drill Stem Test Performed |
1994-10-28 | Production Casing Operation Performed |
1994-10-28 | Rig Released |
1994-11-10 | Perforation Treatment Performed - Jet Perforation |
1994-11-10 | Well Log Performed |
1994-11-12 | Well Log Performed |
1995-02-01 | Well Began Production |
1995-02-01 | Well Fluid changed to Gas |
1995-02-01 | Well Mode changed to Flowing |
1995-06-02 | Perforation Treatment Performed - Jet Perforation |
1995-11-01 | Well Fluid changed to Gas |
1995-11-01 | Well Mode changed to Suspended |
1997-11-12 | Perforation Treatment Performed - Jet Perforation |
2008-03-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-03-30 | Plug Back Performed |
2008-03-30 | Well Fluid changed to Gas |
2008-03-30 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-10-22 | 794.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-11-10 | Perforation | 1386.00 | 1388.00 | 13 |
1995-06-02 | Perforation | 1366.00 | 1368.00 | 13 |
1995-06-02 | Perforation | 1355.00 | 1356.00 | 13 |
1997-11-12 | Perforation | 1364.00 | 1365.70 | 13 |
2008-03-30 | Packing Device Capped w/Cement | 1375.00 | 1383.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 1114 | 0.0 | 0.0 | 0.0 |
For data sources see[6]