If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404152311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.457756,"lon":-112.058559,"icon":""}]} |
Location: 00/11-23-040-15W4/0 | |
Location Alias: 00/11-23-40-15 W4M | |
Location Alias 2: 00/11-23-040-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 15 | |
Section: 23 | |
County/Municipality: Flagstaff County | |
Well Name: ACL GALAHAD 11-23-40-15 | |
Operator Name: Karve Energy Inc. | |
License Number: 0021723 | |
License Date: 1961-11-22 | |
License Status: Abandoned | |
Spud Date: 1961-11-23 | |
Final Drill Date: 2009-10-01 | |
Well Total Depth: 1059.50 m | |
Surface Hole Latitude: 52.457756 | |
Surface Hole Longitude: -112.058559 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-11-22 | Obtained License |
1961-11-25 | Drill Stem Test Performed |
1961-11-27 | Drill Stem Test Performed |
1961-11-28 | Drill Stem Test Performed |
1961-11-29 | Drill Stem Test Performed |
1961-12-02 | Drill Stem Test Performed |
1961-12-03 | Production Casing Operation Performed |
1961-12-04 | Perforation Treatment Performed - Jet Perforation |
1961-12-05 | Perforation Treatment Performed - Acid Wash - No Pressure |
1961-12-29 | Well Mode changed to Drilled and Cased |
2001-07-18 | Well Began Production |
2001-07-18 | Well Fluid changed to Gas |
2001-07-18 | Well Mode changed to Flowing |
2009-10-01 | Finished Drilling |
2009-10-01 | Perforation Treatment Performed - Open-Hole Completion |
2009-10-02 | Perforation Treatment Performed - Cement Plug |
2009-10-02 | Plug Back Performed |
2009-10-02 | Well Fluid changed to Gas |
2009-10-02 | Well Mode changed to Abandoned Zone |
2009-10-03 | Well Log Performed |
2009-10-04 | Perforation Treatment Performed - Jet Perforation |
2009-10-04 | Well Log Performed |
2009-10-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-10-05 | Well Log Performed |
2009-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-10-07 | Perforation Treatment Performed - Jet Perforation |
2009-10-07 | Well Log Performed |
2009-10-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-10-08 | Perforation Treatment Performed - Jet Perforation |
2009-10-08 | Well Log Performed |
2009-10-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-10-09 | Perforation Treatment Performed - Jet Perforation |
2009-10-09 | Well Log Performed |
2009-10-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-10-10 | Perforation Treatment Performed - Jet Perforation |
2009-10-10 | Well Log Performed |
2009-10-11 | Perforation Treatment Performed - Jet Perforation |
2009-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-10-13 | Perforation Treatment Performed - Remedial Casing |
2009-10-13 | Well Log Performed |
2009-10-24 | Well Abandoned |
2009-10-24 | Well Fluid changed to Gas |
2009-10-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-12-04 | Perforation | 960.70 | 961.60 | 13 |
2009-10-08 | Acid Treatment | 657.00 | 658.00 | 0 |
2009-10-08 | Packing Device Capped w/Cement | 645.00 | 653.00 | 0 |
2009-10-08 | Perforation | 510.00 | 511.00 | 17 |
2009-10-09 | Acid Treatment | 510.00 | 511.00 | 0 |
2009-10-09 | Packing Device Capped w/Cement | 498.00 | 506.00 | 0 |
2009-10-09 | Perforation | 333.00 | 334.00 | 17 |
2009-10-10 | Acid Treatment | 333.00 | 334.00 | 0 |
2009-10-10 | Perforation | 460.00 | 461.00 | 17 |
2009-10-11 | Perforation | 440.00 | 441.00 | 17 |
2009-10-13 | Packing Device Capped w/Cement | 428.00 | 436.00 | 0 |
1961-12-05 | Acid Wash | 960.70 | 961.60 | 0 |
2009-10-13 | Remedial Casing Cementing | 333.00 | 334.00 | 0 |
2009-10-13 | Packing Device Capped w/Cement | 314.00 | 331.00 | 0 |
2009-10-01 | Open Hole/Barefoot Completion | 1007.70 | 1059.50 | 0 |
2009-10-02 | Cement Plug | 864.60 | 1059.50 | 0 |
2009-10-04 | Perforation | 768.00 | 769.00 | 17 |
2009-10-05 | Acid Treatment | 768.00 | 769.00 | 0 |
2009-10-07 | Packing Device Capped w/Cement | 752.00 | 760.00 | 0 |
2009-10-07 | Packing Device Capped w/Cement | 740.00 | 748.00 | 0 |
2009-10-07 | Perforation | 657.00 | 658.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 340 | 0.0 | 0.0 | 0.0 |
2001 | 1516 | 0.0 | 0.0 | 0.0 |
2002 | 118 | 0.0 | 0.0 | 0.0 |
2003 | 8273 | 0.0 | 0.0 | 0.0 |
2004 | 7218 | 0.0 | 0.0 | 0.0 |
2005 | 8327 | 0.0 | 0.0 | 0.0 |
2006 | 8155 | 0.0 | 0.0 | 0.0 |
2007 | 5773 | 0.0 | 0.0 | 0.0 |
2008 | 1826 | 0.0 | 0.0 | 0.0 |
For data sources see[5]