If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404152107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.45514,"lon":-112.100057,"icon":""}]} |
Location: 00/07-21-040-15W4/0 | |
Location Alias: 00/07-21-40-15 W4M | |
Location Alias 2: 00/07-21-040-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 15 | |
Section: 21 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: ARS GALAHAD 7-21-40-15 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0169769 | |
License Date: 1994-08-22 | |
License Status: Issued | |
Spud Date: 1994-09-24 | |
Final Drill Date: 1994-09-28 | |
Well Total Depth: 1146.00 m | |
Surface Hole Latitude: 52.455140 | |
Surface Hole Longitude: -112.100057 |
Date | Event |
---|---|
1994-08-22 | Obtained License |
1994-09-25 | Direction Drilling Operation Performed - Deviate |
1994-09-25 | Surface Casing Operation Performed |
1994-09-28 | Finished Drilling |
1994-09-28 | Well Log Performed |
1994-09-28 | Well Mode changed to Drilled and Cased |
1994-10-01 | Production Casing Operation Performed |
1994-10-01 | Rig Released |
1994-11-01 | Perforation Treatment Performed - Jet Perforation |
1994-11-03 | Well Began Production |
1994-11-03 | Well Fluid changed to Crude Oil |
1994-11-03 | Well Mode changed to Pumping |
1994-11-21 | Well Log Performed |
1995-07-11 | Perforation Treatment Performed - Jet Perforation |
1996-01-01 | Well Fluid changed to Crude Oil |
1996-01-01 | Well Mode changed to Suspended |
1996-10-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-10-10 | Perforation Treatment Performed - Jet Perforation |
1996-10-10 | Plug Back Performed |
1996-10-10 | Well Fluid changed to Crude Oil |
1996-10-10 | Well Mode changed to Abandoned Zone |
2002-05-08 | Perforation Treatment Performed - Jet Perforation |
2007-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-29 | Perforation Treatment Performed - Jet Perforation |
2010-06-30 | Perforation Treatment Performed - Cement Squeeze |
2010-06-30 | Perforation Treatment Performed - Jet Perforation |
2010-06-30 | Plug Back Performed |
2010-07-08 | Perforation Treatment Performed - Jet Perforation |
2010-07-09 | Perforation Treatment Performed - Cement Squeeze |
2010-07-09 | Plug Back Performed |
2010-07-10 | Perforation Treatment Performed - Jet Perforation |
2010-11-21 | Well Fluid changed to Crude Oil |
2010-11-21 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-09-25 | 238.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-11-01 | Perforation | 1059.50 | 1060.20 | 13 |
2010-06-30 | Cement Squeeze | 877.50 | 879.50 | 0 |
2010-06-30 | Perforation | 881.00 | 883.00 | 17 |
2010-06-30 | Cement Squeeze | 881.00 | 883.00 | 0 |
2010-07-08 | Perforation | 1019.50 | 1020.50 | 17 |
2010-07-09 | Cement Squeeze | 1019.50 | 1020.50 | 0 |
2010-07-10 | Perforation | 1053.00 | 1060.20 | 17 |
1995-07-11 | Perforation | 1057.00 | 1058.50 | 13 |
1996-10-10 | Packing Device Capped w/Cement | 1042.00 | 1050.00 | 0 |
1996-10-10 | Perforation | 1019.50 | 1020.50 | 14 |
2002-05-08 | Perforation | 877.50 | 879.50 | 20 |
2002-05-08 | Perforation | 881.00 | 883.00 | 20 |
2007-10-17 | Packing Device Capped w/Cement | 1008.00 | 1016.00 | 0 |
2007-10-17 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
2010-06-29 | Perforation | 877.50 | 879.50 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 1094 | 0.0 | 0.0 | 0.0 |
1995 | 3683 | 0.0 | 0.0 | 0.0 |
2010 | 738 | 0.0 | 0.0 | 0.0 |
2011 | 7393 | 0.0 | 0.0 | 0.0 |
2012 | 7767 | 0.0 | 0.0 | 0.0 |
2013 | 7106 | 0.0 | 0.0 | 0.0 |
2014 | 7662 | 0.0 | 0.0 | 0.0 |
2015 | 7544 | 0.0 | 0.0 | 0.0 |
2016 | 8431 | 0.0 | 0.0 | 0.0 |
2017 | 7899 | 0.0 | 0.0 | 0.0 |
2018 | 8238 | 0.0 | 0.0 | 0.0 |
2019 | 2522 | 0.0 | 0.0 | 0.0 |
2020 | 2078 | 0.0 | 0.0 | 0.0 |
For data sources see[6]