X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404151013003

Well Details

Well ID: 0404151013003
Loading map...
Location: 00/13-10-040-15W4/3
Location Alias: 00/13-10-40-15 W4M
Location Alias 2: 00/13-10-040-15 W4/03
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 15
Section: 10
County/Municipality: County of Paintearth No. 18
Well Name: KARVE GALAHAD 13-10-40-15
Operator Name: Karve Energy Inc.
License Number: 0259952
License Date: 2001-09-25
License Status: Suspension
Spud Date: 2001-10-02
Final Drill Date: 2001-10-10
Well Total Depth: 1210.00 m
Surface Hole Latitude: 52.432419
Surface Hole Longitude: -112.090916

For data sources see[1][2]

Well History

Date Event
2001-09-25 Obtained License
2001-10-03 Surface Casing Operation Performed
2001-10-05 Direction Drilling Operation Performed - Deviate
2001-10-09 Production Casing Operation Performed
2001-10-09 Well Log Performed
2001-10-10 Finished Drilling
2001-10-10 Rig Released
2001-10-10 Well Mode changed to Drilled and Cased
2001-10-16 Perforation Treatment Performed - Jet Perforation
2001-10-16 Well Log Performed
2001-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-17 Perforation Treatment Performed - Jet Perforation
2001-10-17 Plug Back Performed
2001-10-17 Well Log Performed
2001-10-19 Perforation Treatment Performed - Jet Perforation
2001-10-21 Perforation Treatment Performed - Jet Perforation
2001-10-21 Well Mode changed to Drilled and Cased
2002-05-01 Well Began Production
2002-05-01 Well Fluid changed to Gas
2002-05-01 Well Mode changed to Flowing
2007-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-26 Plug Back Performed
2007-02-26 Well Log Performed
2010-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-29 Plug Back Performed
2010-03-29 Well Fluid changed to Gas
2010-03-29 Well Mode changed to Abandoned Zone
2010-03-30 Perforation Treatment Performed - Jet Perforation
2010-04-02 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-10-05 496.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-10-16 Perforation 1114.00 1115.50 17
2010-03-30 Perforation 904.00 909.00 17
2010-04-02 Fracture 904.00 920.00 0
2001-10-17 Packing Device Capped w/Cement 1105.00 1113.00 0
2001-10-17 Perforation 1081.00 1081.50 17
2001-10-19 Perforation 1078.50 1079.50 17
2001-10-21 Perforation 1049.00 1050.00 17
2007-02-26 Packing Device Capped w/Cement 1067.00 1075.00 0
2010-03-29 Packing Device Capped w/Cement 1032.00 1040.00 0
2010-03-30 Perforation 914.00 920.00 17
2010-03-30 Perforation 909.00 914.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6753 0.0 0.0 0.0
2003 7159 0.0 0.0 0.0
2004 114 0.0 0.0 0.0
2007 5612 0.0 0.0 0.0

For data sources see[6]

References