X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404133205B02

Well Details

Well ID: 0404133205B02
Loading map...
Location: B0/05-32-040-13W4/2
Location Alias: B0/05-32-40-13 W4M
Location Alias 2: B0/05-32-040-13 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 32
County/Municipality: Flagstaff County
Well Name: KARVE PROVOST 5-32-40-13
Operator Name: Karve Energy Inc.
License Number: 0152529
License Date: 1992-05-20
License Status: Suspension
Spud Date: 1992-06-11
Final Drill Date: 1992-06-14
Well Total Depth: 1020.00 m
Surface Hole Latitude: 52.481603
Surface Hole Longitude: -111.850376

For data sources see[1][2]

Well History

Date Event
1992-05-20 Obtained License
1992-06-12 Surface Casing Operation Performed
1992-06-14 Finished Drilling
1992-06-14 Well Log Performed
1992-06-14 Well Mode changed to Drilled and Cased
1992-06-15 Production Casing Operation Performed
1992-06-15 Rig Released
1992-06-26 Well Log Performed
1992-07-22 Perforation Treatment Performed - Jet Perforation
1995-01-19 Perforation Treatment Performed - Jet Perforation
1996-07-04 Perforation Treatment Performed - Jet Perforation
1996-07-04 Well Log Performed
2003-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-05 Perforation Treatment Performed - Jet Perforation
2003-07-05 Plug Back Performed
2006-02-07 Well Began Production
2006-02-07 Well Fluid changed to Crude Oil
2006-02-07 Well Mode changed to Flowing
2014-05-30 Well Fluid changed to Crude Oil
2014-05-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-07-22 Perforation 982.00 985.00 13
1995-01-19 Perforation 982.00 984.00 17
1996-07-04 Perforation 977.80 978.80 17
1996-07-04 Perforation 979.40 980.40 17
2003-07-05 Packing Device Capped w/Cement 966.00 974.00 0
2003-07-05 Perforation 814.00 815.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6850 0.0 0.0 0.0
2007 8048 0.0 0.0 0.0
2008 8164 0.0 0.0 0.0
2009 8440 0.0 0.0 0.0
2010 5875 0.0 0.0 0.0

For data sources see[5]

References