If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404133006020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.480242,"lon":-111.867968,"icon":""}]} |
Location: 02/06-30-040-13W4/0 | |
Location Alias: 02/06-30-40-13 W4M | |
Location Alias 2: 02/06-30-040-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 13 | |
Section: 30 | |
County/Municipality: Flagstaff County | |
Well Name: KARVE PROVOST 6-30-40-13 | |
Operator Name: Karve Energy Inc. | |
License Number: 0420256 | |
License Date: 2010-05-05 | |
License Status: Issued | |
Spud Date: 2010-05-14 | |
Final Drill Date: 2010-05-21 | |
Well Total Depth: 2248.50 m | |
Surface Hole Latitude: 52.480242 | |
Surface Hole Longitude: -111.867968 |
Date | Event |
---|---|
2010-05-05 | Obtained License |
2010-05-15 | Surface Casing Operation Performed |
2010-05-16 | Direction Drilling Operation Performed - Horizontal |
2010-05-17 | Intermediate Casing Operation Performed |
2010-05-17 | Well Log Performed |
2010-05-21 | Finished Drilling |
2010-05-21 | Well Log Performed |
2010-05-21 | Well Mode changed to Drilled and Cased |
2010-05-22 | Liner Casing Operation Performed |
2010-05-22 | Perforation Treatment Performed - Open-Hole Completion |
2010-05-23 | Rig Released |
2010-06-06 | Well Log Performed |
2010-06-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-06-24 | Well Began Production |
2010-06-24 | Well Fluid changed to Crude Oil |
2010-06-24 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-05-16 | 588.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-05-22 | Open Hole/Barefoot Completion | 1060.00 | 2248.50 | 0 |
2010-06-16 | Multi-Stage Fracture | 1251.00 | 1251.10 | 0 |
2010-06-16 | Multi-Stage Fracture | 1117.00 | 1117.10 | 0 |
2010-06-16 | Multi-Stage Fracture | 2187.00 | 2187.10 | 0 |
2010-06-16 | Multi-Stage Fracture | 2063.00 | 2063.10 | 0 |
2010-06-16 | Multi-Stage Fracture | 1964.00 | 1964.20 | 0 |
2010-06-16 | Multi-Stage Fracture | 1840.00 | 1840.10 | 0 |
2010-06-16 | Multi-Stage Fracture | 1718.00 | 1718.10 | 0 |
2010-06-16 | Multi-Stage Fracture | 1595.00 | 1595.10 | 0 |
2010-06-16 | Multi-Stage Fracture | 1472.00 | 1472.10 | 0 |
2010-06-16 | Multi-Stage Fracture | 1362.00 | 1362.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 3666 | 0.0 | 0.0 | 0.0 |
2011 | 8012 | 0.0 | 0.0 | 0.0 |
2012 | 8431 | 0.0 | 0.0 | 0.0 |
2013 | 8415 | 0.0 | 0.0 | 0.0 |
2014 | 8340 | 0.0 | 0.0 | 0.0 |
2015 | 8113 | 0.0 | 0.0 | 0.0 |
2016 | 8668 | 0.0 | 0.0 | 0.0 |
2017 | 8589 | 0.0 | 0.0 | 0.0 |
2018 | 8460 | 0.0 | 0.0 | 0.0 |
2019 | 8468 | 0.0 | 0.0 | 0.0 |
2020 | 2123 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-06-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]