X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404131616040

Well Details

Well ID: 0404131616040
Loading map...
Location: 04/16-16-040-13W4/0
Location Alias: 04/16-16-40-13 W4M
Location Alias 2: 04/16-16-040-13 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 16
County/Municipality: Flagstaff County
Well Name: PRED B-2 HALKIRKE 16-16-40-13
Operator Name: Canadian Coyote Energy Ltd.
License Number: 0140270
License Date: 1989-06-30
License Status: Abandoned
Spud Date: 1989-07-01
Final Drill Date: 1989-07-05
Well Total Depth: 1065.00 m
Surface Hole Latitude: 52.446235
Surface Hole Longitude: -111.812907

For data sources see[1][2]

Well History

Date Event
1989-06-30 Obtained License
1989-07-02 Surface Casing Operation Performed
1989-07-03 Direction Drilling Operation Performed - Deviate
1989-07-05 Finished Drilling
1989-07-05 Well Log Performed
1989-07-05 Well Mode changed to Drilled and Cased
1989-07-06 Production Casing Operation Performed
1989-07-06 Rig Released
1989-07-06 Well Log Performed
1989-08-30 Perforation Treatment Performed - Jet Perforation
1989-08-30 Well Log Performed
1989-10-01 Well Began Production
1989-10-01 Well Fluid changed to Crude Oil
1989-10-01 Well Mode changed to Pumping
1990-11-21 Perforation Treatment Performed - Jet Perforation
1990-11-21 Well Log Performed
1994-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-20 Plug Back Performed
1994-10-31 Well Fluid changed to Crude Oil
1994-10-31 Well Mode changed to Suspended
1995-09-16 Perforation Treatment Performed - Jet Perforation
1995-09-22 Perforation Treatment Performed - Remedial Casing
1995-09-22 Well Fluid changed to Crude Oil
1995-09-22 Well Mode changed to Abandoned
1995-10-12 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-07-03 208.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-08-30 Perforation 1020.50 1021.70 13
1990-11-21 Perforation 1020.50 1023.00 13
1994-10-20 Packing Device Capped w/Cement 1004.00 1012.00 0
1995-09-16 Perforation 425.00 426.00 10
1995-09-22 Remedial Casing Cementing 425.00 426.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2178 0.0 0.0 0.0
1990 8705 0.0 0.0 0.0
1991 8753 0.0 0.0 0.0
1992 7580 0.0 0.0 0.0
1993 6382 0.0 0.0 0.0
1994 6744 0.0 0.0 0.0

For data sources see[6]

References