X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404131011030

Well Details

Well ID: 0404131011030
Loading map...
Location: 03/11-10-040-13W4/0
Location Alias: 03/11-10-40-13 W4M
Location Alias 2: 03/11-10-040-13 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 10
County/Municipality: Flagstaff County
Well Name: PRED B-1 HALKIRKE 11-10-40-13
Operator Name: Canadian Coyote Energy Ltd.
License Number: 0123598
License Date: 1986-08-05
License Status: Abandoned
Spud Date: 1986-08-22
Final Drill Date: 1986-08-25
Well Total Depth: 1025.00 m
Surface Hole Latitude: 52.427902
Surface Hole Longitude: -111.795026

For data sources see[1][2]

Well History

Date Event
1986-08-05 Obtained License
1986-08-22 Surface Casing Operation Performed
1986-08-24 Direction Drilling Operation Performed - Deviate
1986-08-25 Finished Drilling
1986-08-25 Well Log Performed
1986-08-25 Well Mode changed to Drilled and Cased
1986-08-26 Production Casing Operation Performed
1986-08-26 Rig Released
1986-10-15 Well Log Performed
1986-11-29 Perforation Treatment Performed - Jet Perforation
1986-11-29 Well Log Performed
1986-11-30 Well Began Production
1986-11-30 Well Fluid changed to Crude Oil
1986-11-30 Well Mode changed to Pumping
1998-03-01 Well Fluid changed to Crude Oil
1998-03-01 Well Mode changed to Suspended
2003-07-23 Well Log Performed
2003-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-24 Plug Back Performed
2003-07-24 Well Fluid changed to Crude Oil
2003-07-24 Well Mode changed to Abandoned Zone
2003-07-28 Perforation Treatment Performed - Jet Perforation
2003-07-28 Well Log Performed
2003-07-29 Perforation Treatment Performed - Remedial Casing
2003-10-27 Well Abandoned
2003-10-27 Well Fluid changed to Crude Oil
2003-10-27 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1986-08-24 798.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-11-29 Perforation 985.60 990.00 13
2003-07-24 Packing Device Capped w/Cement 648.00 980.00 0
2003-07-28 Perforation 165.00 165.30 13
2003-07-29 Remedial Casing Cementing 165.00 165.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 648 0.0 0.0 0.0
1987 7907 0.0 0.0 0.0
1988 7828 0.0 0.0 0.0
1989 8591 0.0 0.0 0.0
1990 8710 0.0 0.0 0.0
1991 8445 0.0 0.0 0.0
1992 8060 0.0 0.0 0.0
1993 7547 0.0 0.0 0.0
1994 6078 0.0 0.0 0.0
1995 7217 0.0 0.0 0.0
1996 5422 0.0 0.0 0.0
1997 3504 0.0 0.0 0.0

For data sources see[6]

References