If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404130306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.421771,"lon":-111.797018,"icon":""}]} |
Location: 00/06-03-040-13W4/0 | |
Location Alias: 00/06-03-40-13 W4M | |
Location Alias 2: 00/06-03-040-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 13 | |
Section: 03 | |
County/Municipality: Flagstaff County | |
Well Name: KARVE PROVOST 6-3-40-13 | |
Operator Name: Karve Energy Inc. | |
License Number: 0418726 | |
License Date: 2010-02-19 | |
License Status: Issued | |
Spud Date: 2010-02-27 | |
Final Drill Date: 2010-03-05 | |
Well Total Depth: 2183.00 m | |
Surface Hole Latitude: 52.421771 | |
Surface Hole Longitude: -111.797018 |
Date | Event |
---|---|
2010-02-19 | Obtained License |
2010-02-27 | Surface Casing Operation Performed |
2010-03-01 | Direction Drilling Operation Performed - Horizontal |
2010-03-01 | Well Log Performed |
2010-03-02 | Intermediate Casing Operation Performed |
2010-03-02 | Well Log Performed |
2010-03-05 | Finished Drilling |
2010-03-05 | Well Log Performed |
2010-03-05 | Well Mode changed to Drilled and Cased |
2010-03-06 | Liner Casing Operation Performed |
2010-03-06 | Perforation Treatment Performed - Open-Hole Completion |
2010-03-07 | Rig Released |
2010-03-08 | Well Log Performed |
2010-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-05-19 | Well Began Production |
2010-05-19 | Well Fluid changed to Crude Oil |
2010-05-19 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-03-01 | 570.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-03-06 | Open Hole/Barefoot Completion | 1011.00 | 2183.00 | 0 |
2010-03-11 | Multi-Stage Fracture | 1189.00 | 1189.10 | 0 |
2010-03-11 | Multi-Stage Fracture | 1073.00 | 1073.10 | 0 |
2010-03-11 | Multi-Stage Fracture | 2064.00 | 2064.10 | 0 |
2010-03-11 | Multi-Stage Fracture | 1934.00 | 1934.10 | 0 |
2010-03-11 | Multi-Stage Fracture | 1859.00 | 1859.10 | 0 |
2010-03-11 | Multi-Stage Fracture | 1729.00 | 1729.10 | 0 |
2010-03-11 | Multi-Stage Fracture | 1627.00 | 1627.10 | 0 |
2010-03-11 | Multi-Stage Fracture | 1511.00 | 1511.10 | 0 |
2010-03-11 | Multi-Stage Fracture | 1422.00 | 1422.10 | 0 |
2010-03-11 | Multi-Stage Fracture | 1306.00 | 1306.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 4919 | 0.0 | 0.0 | 0.0 |
2011 | 7220 | 0.0 | 0.0 | 0.0 |
2012 | 8354 | 0.0 | 0.0 | 0.0 |
2013 | 8059 | 0.0 | 0.0 | 0.0 |
2014 | 8151 | 0.0 | 0.0 | 0.0 |
2015 | 7910 | 0.0 | 0.0 | 0.0 |
2018 | 7536 | 0.0 | 0.0 | 0.0 |
2019 | 8246 | 0.0 | 0.0 | 0.0 |
2020 | 1899 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-03-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]