X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404123402000

Well Details

Well ID: 0404123402000
Loading map...
Location: 00/02-34-040-12W4/0
Location Alias: 00/02-34-40-12 W4M
Location Alias 2: 00/02-34-040-12 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 34
County/Municipality: Flagstaff County
Well Name: TIV ET AL THOMPSON LAKE 2-34-40-12
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0101750
License Date: 1983-06-15
License Status: RecCertified
Spud Date: 1983-07-10
Final Drill Date: 1983-07-13
Well Total Depth: 997.00 m
Surface Hole Latitude: 52.478770
Surface Hole Longitude: -111.646694

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-06-15 Obtained License
1983-07-13 Finished Drilling
1983-07-13 Well Log Performed
1983-07-13 Well Mode changed to Drilled and Cased
1983-07-14 Drill Stem Test Performed
1983-07-15 Production Casing Operation Performed
1983-08-01 Well Began Production
1983-08-01 Well Fluid changed to Crude Oil
1983-08-01 Well Mode changed to Pumping
1983-08-03 Perforation Treatment Performed - Jet Perforation
1984-05-23 Perforation Treatment Performed - Casing Patch (Over Perfs)
1986-03-01 Well Fluid changed to Crude Oil
1986-03-01 Well Mode changed to Suspended
1987-09-10 Well Fluid changed to Crude Oil
1987-09-10 Well Mode changed to Pumping
1990-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-25 Plug Back Performed
1990-11-25 Well Abandoned
1990-11-25 Well Fluid changed to Crude Oil
1990-11-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-03 Perforation 963.80 965.30 13
1983-08-03 Perforation 967.50 970.10 13
1984-05-23 Casing Patch 967.50 970.10 0
1990-11-25 Packing Device Capped w/Cement 937.00 945.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3013 0.0 0.0 0.0
1984 8103 0.0 0.0 0.0
1985 7361 0.0 0.0 0.0
1986 710 0.0 0.0 0.0
1987 120 0.0 0.0 0.0

For data sources see[5]

References