X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404122915030

Well Details

Well ID: 0404122915030
Loading map...
Location: 03/15-29-040-12W4/0
Location Alias: 03/15-29-40-12 W4M
Location Alias 2: 03/15-29-040-12 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 29
County/Municipality: Flagstaff County
Well Name: CPEC PROVOST 15-29-40-12
Operator Name: Crescent Point Energy Corp.
License Number: 0151755
License Date: 1992-02-19
License Status: Abandoned
Spud Date: 1992-02-26
Final Drill Date: 1992-03-01
Well Total Depth: 1084.00 m
Surface Hole Latitude: 52.475190
Surface Hole Longitude: -111.697501

For data sources see[1][2]

Well History

Date Event
1992-02-19 Obtained License
1992-02-27 Direction Drilling Operation Performed - Deviate
1992-02-27 Surface Casing Operation Performed
1992-03-01 Finished Drilling
1992-03-01 Production Casing Operation Performed
1992-03-01 Well Log Performed
1992-03-01 Well Mode changed to Drilled and Cased
1992-03-02 Rig Released
1992-03-02 Well Log Performed
1992-03-14 Perforation Treatment Performed - Jet Perforation
1992-03-14 Well Log Performed
1992-04-01 Well Began Production
1992-04-01 Well Fluid changed to Crude Oil
1992-04-01 Well Mode changed to Pumping
1996-04-05 Perforation Treatment Performed - Cement Squeeze
1996-04-05 Plug Back Performed
1996-04-09 Perforation Treatment Performed - Jet Perforation
1996-04-24 Perforation Treatment Performed - Selective Jet Perforations
1996-07-19 Perforation Treatment Performed - Cement Squeeze
1996-07-23 Perforation Treatment Performed - Jet Perforation
1997-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-05 Plug Back Performed
1997-01-05 Well Fluid changed to Crude Oil
1997-01-05 Well Mode changed to Abandoned and Whipstocked
2014-11-22 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-02-27 262.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-03-14 Perforation 1015.00 1016.50 13
1996-04-05 Cement Squeeze 1015.00 1016.50 0
1996-04-09 Perforation 1015.50 1019.00 14
1996-04-24 Selective Jet Perforations 1015.00 1016.50 0
1996-07-19 Cement Squeeze 1015.00 1019.00 0
1996-07-23 Perforation 1015.00 1016.50 14
1997-01-05 Packing Device Capped w/Cement 997.00 1005.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 6440 0.0 0.0 0.0
1993 8400 0.0 0.0 0.0
1994 7998 0.0 0.0 0.0
1995 4655 0.0 0.0 0.0
1996 6414 0.0 0.0 0.0

For data sources see[6]

References