X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404120709B00

Well Details

Well ID: 0404120709B00
Loading map...
Location: B0/09-07-040-12W4/0
Location Alias: B0/09-07-40-12 W4M
Location Alias 2: B0/09-07-040-12 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 07
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 9-7-40-12
Operator Name: AlphaBow Energy Ltd.
License Number: 0153982
License Date: 1992-10-07
License Status: Abandoned
Spud Date: 1992-11-03
Final Drill Date: 1992-11-09
Well Total Depth: 1167.00 m
Surface Hole Latitude: 52.426270
Surface Hole Longitude: -111.718637

For data sources see[1][2]

Well History

Date Event
1992-10-07 Obtained License
1992-11-03 Direction Drilling Operation Performed - Deviate
1992-11-04 Surface Casing Operation Performed
1992-11-09 Finished Drilling
1992-11-09 Well Log Performed
1992-11-09 Well Mode changed to Drilled and Cased
1992-11-10 Production Casing Operation Performed
1992-11-10 Rig Released
1992-12-13 Perforation Treatment Performed - Jet Perforation
1992-12-13 Well Log Performed
1992-12-15 Well Log Performed
1993-01-25 Well Began Production
1993-01-25 Well Fluid changed to Crude Oil
1993-01-25 Well Mode changed to Pumping
1998-10-30 Well Fluid changed to Crude Oil
1998-10-30 Well Mode changed to Suspended
1999-02-17 Perforation Treatment Performed - Jet Perforation
1999-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-18 Plug Back Performed
1999-02-18 Well Fluid changed to Crude Oil
1999-02-18 Well Mode changed to Abandoned Zone
2019-06-13 Well Abandoned
2019-06-13 Well Fluid changed to Crude Oil
2019-06-13 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-11-03 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-13 Perforation 1041.50 1042.50 13
1992-12-13 Perforation 1044.00 1046.00 13
1999-02-17 Perforation 1046.00 1048.50 13
1999-02-18 Packing Device Capped w/Cement 1029.00 1037.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 8052 0.0 0.0 0.0
1994 8364 0.0 0.0 0.0
1995 8430 0.0 0.0 0.0
1996 7468 0.0 0.0 0.0
1997 1255 0.0 0.0 0.0

For data sources see[6]

References