If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0404120402A00 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: A0/02-04-040-12W4/0 | |
| Location Alias: A0/02-04-40-12 W4M | |
| Location Alias 2: A0/02-04-040-12 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 04 | |
| County/Municipality: Flagstaff County | |
| Well Name: 1994450AB PROVOST 2-4-40-12 | |
| Operator Name: AlphaBow Energy Ltd. | |
| License Number: 0170346 | |
| License Date: 1994-09-12 | |
| License Status: Suspension | |
| Spud Date: 1994-09-21 | |
| Final Drill Date: 1994-09-27 | |
| Well Total Depth: 1296.00 m | |
| Surface Hole Latitude: 52.408905 | |
| Surface Hole Longitude: -111.668072 |
| Date | Event |
|---|---|
| 1994-09-12 | Obtained License |
| 1994-09-22 | Surface Casing Operation Performed |
| 1994-09-23 | Well Log Performed |
| 1994-09-24 | Direction Drilling Operation Performed - Horizontal |
| 1994-09-27 | Finished Drilling |
| 1994-09-27 | Well Log Performed |
| 1994-09-27 | Well Mode changed to Drilled and Cased |
| 1994-09-28 | Intermediate Casing Operation Performed |
| 1994-09-28 | Liner Casing Operation Performed |
| 1994-09-28 | Rig Released |
| 1994-10-10 | Perforation Treatment Performed - Open-Hole Completion |
| 1994-10-10 | Perforation Treatment Performed - Slotted Liner or Casing |
| 1994-10-14 | Well Began Production |
| 1994-10-14 | Well Fluid changed to Crude Oil |
| 1994-10-14 | Well Mode changed to Pumping |
| 2001-09-30 | Well Log Performed |
| 2001-10-04 | Well Log Performed |
| 2001-10-05 | Well Log Performed |
| 2001-10-10 | Perforation Treatment Performed - Jet Perforation |
| 2001-10-10 | Perforation Treatment Performed - Remedial Casing |
| 2001-10-10 | Well Log Performed |
| 2010-11-25 | Well Fluid changed to Crude Oil |
| 2010-11-25 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1994-09-24 | 1011.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-10-10 | Slotted Liner | 1061.40 | 1287.20 | 0 |
| 1994-10-10 | Open Hole/Barefoot Completion | 1287.20 | 1296.00 | 0 |
| 2001-10-10 | Perforation | 195.50 | 195.80 | 24 |
| 2001-10-10 | Remedial Casing Cementing | 195.50 | 195.80 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 1851 | 0.0 | 0.0 | 0.0 |
| 1995 | 8253 | 0.0 | 0.0 | 0.0 |
| 1996 | 8555 | 0.0 | 0.0 | 0.0 |
| 1997 | 8307 | 0.0 | 0.0 | 0.0 |
| 1998 | 8156 | 0.0 | 0.0 | 0.0 |
| 1999 | 8308 | 0.0 | 0.0 | 0.0 |
| 2000 | 8275 | 0.0 | 0.0 | 0.0 |
| 2001 | 7554 | 0.0 | 0.0 | 0.0 |
| 2006 | 240 | 0.0 | 0.0 | 0.0 |
For data sources see[6]