X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404113107022

Well Details

Well ID: 0404113107022
Loading map...
Location: 02/07-31-040-11W4/2
Location Alias: 02/07-31-40-11 W4M
Location Alias 2: 02/07-31-040-11 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 11
Section: 31
County/Municipality: Flagstaff County
Well Name: WLEC PROVOST 10-31-40-11
Operator Name: West Lake Energy Corp.
License Number: 0180874
License Date: 1995-09-21
License Status: Amended
Spud Date: 1995-10-06
Final Drill Date: 1995-10-13
Well Total Depth: 990.00 m
Surface Hole Latitude: 52.484349
Surface Hole Longitude: -111.572685

For data sources see[1][2]

Well History

Date Event
1995-09-21 Obtained License
1995-10-06 Surface Casing Operation Performed
1995-10-07 Direction Drilling Operation Performed - Deviate
1995-10-11 Direction Drilling Operation Performed - Deviate
1995-10-13 Finished Drilling
1995-10-13 Well Mode changed to Drilled and Cased
1995-10-14 Production Casing Operation Performed
1995-10-14 Rig Released
1995-10-14 Well Log Performed
1995-10-19 Well Log Performed
1995-10-26 Perforation Treatment Performed - Jet Perforation
1995-10-26 Well Log Performed
1995-10-29 Well Began Production
1995-10-29 Well Fluid changed to Crude Oil
1995-10-29 Well Mode changed to Flowing
1997-06-16 Well Fluid changed to Crude Oil
1997-06-16 Well Mode changed to Pumping
2006-10-18 Perforation Treatment Performed - Jet Perforation
2006-10-18 Perforation Treatment Performed - Remedial Casing
2006-10-18 Well Log Performed
2018-12-01 Well Fluid changed to Crude Oil
2018-12-01 Well Mode changed to Suspended
2019-04-25 Well Fluid changed to Crude Oil
2019-04-25 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-10-07 308.00 Deviate (5 - 79 degrees)
1995-10-11 386.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-26 Perforation 952.00 953.50 13
2006-10-18 Perforation 15.00 16.00 7
2006-10-18 Remedial Casing Cementing 15.00 16.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1512 0.0 0.0 0.0
1996 8759 0.0 0.0 0.0
1997 8317 0.0 0.0 0.0
1998 8463 0.0 0.0 0.0
1999 8214 0.0 0.0 0.0
2000 8276 0.0 0.0 0.0
2001 8241 0.0 0.0 0.0
2002 8251 0.0 0.0 0.0
2003 2855 0.0 0.0 0.0
2006 1208 0.0 0.0 0.0
2007 7800 0.0 0.0 0.0
2008 7284 0.0 0.0 0.0
2009 8432 0.0 0.0 0.0
2010 8588 0.0 0.0 0.0
2011 8637 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 8598 0.0 0.0 0.0
2014 8639 0.0 0.0 0.0
2015 8686 0.0 0.0 0.0
2016 8623 0.0 0.0 0.0
2017 7244 0.0 0.0 0.0
2019 4231 0.0 0.0 0.0
2020 1992 0.0 0.0 0.0

For data sources see[6]

References