X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102702030

Well Details

Well ID: 0404102702030
Loading map...
Location: 03/02-27-040-10W4/0
Location Alias: 03/02-27-40-10 W4M
Location Alias 2: 03/02-27-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 27
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 2-27-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0075383
License Date: 1979-04-27
License Status: Abandoned
Spud Date: 1979-05-01
Final Drill Date: 1979-05-03
Well Total Depth: 875.40 m
Surface Hole Latitude: 52.464143
Surface Hole Longitude: -111.358562

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-27 Obtained License
1979-05-03 Finished Drilling
1979-05-03 Well Mode changed to Drilled and Cased
1979-05-05 Production Casing Operation Performed
1979-05-27 Perforation Treatment Performed - Open-Hole Completion
1979-06-01 Well Began Production
1979-06-01 Well Fluid changed to Crude Oil
1979-06-01 Well Mode changed to Pumping
1999-02-23 Well Fluid changed to Crude Oil
1999-02-23 Well Mode changed to Suspended
1999-05-01 Well Fluid changed to Crude Oil
1999-05-01 Well Mode changed to Pumping
2000-06-01 Well Fluid changed to Crude Oil
2000-06-01 Well Mode changed to Pumping
2007-01-26 Well Fluid changed to Crude Oil
2007-01-26 Well Log Performed
2007-01-26 Well Mode changed to Suspended
2015-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-05-27 Plug Back Performed
2015-05-27 Well Fluid changed to Crude Oil
2015-05-27 Well Mode changed to Abandoned Zone
2015-07-21 Well Abandoned
2015-07-21 Well Fluid changed to Crude Oil
2015-07-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-05-27 Open Hole/Barefoot Completion 872.00 875.40 0
2015-05-27 Packing Device Capped w/Cement 856.20 864.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 4888 0.0 0.0 0.0
1980 5963 0.0 0.0 0.0
1981 7995 0.0 0.0 0.0
1982 7116 0.0 0.0 0.0
1983 8423 0.0 0.0 0.0
1984 7908 0.0 0.0 0.0
1985 8005 0.0 0.0 0.0
1986 8552 0.0 0.0 0.0
1987 7993 0.0 0.0 0.0
1988 7553 0.0 0.0 0.0
1989 8665 0.0 0.0 0.0
1990 7646 0.0 0.0 0.0
1991 4580 0.0 0.0 0.0
1992 8595 0.0 0.0 0.0
1993 8514 0.0 0.0 0.0
1994 8614 0.0 0.0 0.0
1995 7963 0.0 0.0 0.0
1996 8424 0.0 0.0 0.0
1997 8375 0.0 0.0 0.0
1998 7125 0.0 0.0 0.0
1999 1246 0.0 0.0 0.0
2000 3574 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References