X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102702002

Well Details

Well ID: 0404102702002
Loading map...
Location: 00/02-27-040-10W4/2
Location Alias: 00/02-27-40-10 W4M
Location Alias 2: 00/02-27-040-10 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 27
County/Municipality: Flagstaff County
Well Name: HUSKY ET AL CHOICE 2-27-40-10
Operator Name: Cleveland Power Corporation Ltd
License Number: 0017302
License Date: 1959-06-24
License Status: Abandoned
Spud Date: 1959-06-29
Final Drill Date: 1959-07-03
Well Total Depth: 899.80 m
Surface Hole Latitude: 52.464944
Surface Hole Longitude: -111.357391

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-24 Obtained License
1959-07-03 Finished Drilling
1959-07-04 Production Casing Operation Performed
1959-07-07 Perforation Treatment Performed - Jet Perforation
1959-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-09 Perforation Treatment Performed - Jet Perforation
1975-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-09-26 Perforation Treatment Performed - Jet Perforation
1975-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-09-29 Perforation Treatment Performed - Bridge Plug No Cement Required
1975-09-29 Perforation Treatment Performed - Jet Perforation
1976-01-23 Well Mode changed to Drilled and Cased
1976-09-01 Well Began Production
1976-09-01 Well Fluid changed to Gas
1976-09-01 Well Mode changed to Flowing
1981-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-30 Plug Back Performed
1981-09-30 Well Fluid changed to Gas
1981-09-30 Well Mode changed to Abandoned
1981-10-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-07-07 Perforation 877.20 878.40 13
1981-09-30 Packing Device Capped w/Cement 717.40 725.40 0
1959-07-08 Acid Treatment 877.20 878.40 0
1959-07-09 Perforation 877.80 878.70 13
1975-09-26 Packing Device Capped w/Cement 827.80 827.80 0
1975-09-26 Perforation 783.90 787.00 7
1975-09-26 Acid Treatment 783.90 787.00 0
1975-09-29 Bridge Plug, No Cement 779.40 779.40 0
1975-09-29 Perforation 733.30 734.60 7
1975-09-29 Acid Treatment 733.30 734.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1360 0.0 0.0 0.0
1977 6156 0.0 0.0 0.0
1978 5680 0.0 0.0 0.0
1979 3327 0.0 0.0 0.0

For data sources see[5]

References