X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102215000

Well Details

Well ID: 0404102215000
Loading map...
Location: 00/15-22-040-10W4/0
Location Alias: 00/15-22-40-10 W4M
Location Alias 2: 00/15-22-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 22
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 15-22-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0017608
License Date: 1959-08-20
License Status: Abandoned
Spud Date: 1959-09-01
Final Drill Date: 1959-09-05
Well Total Depth: 874.80 m
Surface Hole Latitude: 52.461147
Surface Hole Longitude: -111.356695

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-08-20 Obtained License
1959-09-05 Finished Drilling
1959-09-05 Well Mode changed to Drilled and Cased
1959-09-07 Production Casing Operation Performed
1959-09-09 Perforation Treatment Performed - Bullet Perforation
1959-10-04 Well Began Production
1959-10-04 Well Fluid changed to Crude Oil
1959-10-04 Well Mode changed to Pumping
1961-12-01 Well Fluid changed to Crude Oil
1961-12-01 Well Mode changed to Suspended
1962-05-16 Well Fluid changed to Crude Oil
1962-05-16 Well Mode changed to Pumping
1991-03-22 Well Log Performed
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Suspended
1998-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-26 Perforation Treatment Performed - Jet Perforation
1998-11-26 Plug Back Performed
1998-11-26 Well Log Performed
1998-11-27 Perforation Treatment Performed - Remedial Casing
1998-12-01 Well Abandoned
1998-12-01 Well Fluid changed to Crude Oil
1998-12-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-09 Bullet Perforation 869.60 872.00 13
1998-11-26 Packing Device Capped w/Cement 852.00 860.00 0
1998-11-26 Perforation 163.00 164.00 13
1998-11-27 Remedial Casing Cementing 163.00 164.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8297 0.0 0.0 0.0
1968 8142 0.0 0.0 0.0
1969 7485 0.0 0.0 0.0
1970 8094 0.0 0.0 0.0
1971 6928 0.0 0.0 0.0
1972 7390 0.0 0.0 0.0
1973 8076 0.0 0.0 0.0
1974 8705 0.0 0.0 0.0
1975 8549 0.0 0.0 0.0
1976 8506 0.0 0.0 0.0
1977 8737 0.0 0.0 0.0
1978 8682 0.0 0.0 0.0
1979 8463 0.0 0.0 0.0
1980 7700 0.0 0.0 0.0
1981 8627 0.0 0.0 0.0
1982 8581 0.0 0.0 0.0
1983 8262 0.0 0.0 0.0
1984 8441 0.0 0.0 0.0
1985 8325 0.0 0.0 0.0
1986 8503 0.0 0.0 0.0
1987 8071 0.0 0.0 0.0
1988 8562 0.0 0.0 0.0
1989 8456 0.0 0.0 0.0
1990 7551 0.0 0.0 0.0
1991 4971 0.0 0.0 0.0
1992 3659 0.0 0.0 0.0

For data sources see[5]

References