X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102213020

Well Details

Well ID: 0404102213020
Loading map...
Location: 02/13-22-040-10W4/0
Location Alias: 02/13-22-40-10 W4M
Location Alias 2: 02/13-22-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 22
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 13-22-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0048126
License Date: 1973-11-26
License Status: Suspension
Spud Date: 1973-12-08
Final Drill Date: 1973-12-11
Well Total Depth: 899.20 m
Surface Hole Latitude: 52.461867
Surface Hole Longitude: -111.366312

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-11-26 Obtained License
1973-12-11 Finished Drilling
1973-12-11 Production Casing Operation Performed
1973-12-11 Well Mode changed to Drilled and Cased
1973-12-20 Perforation Treatment Performed - Jet Perforation
1973-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-10 Well Began Production
1974-01-10 Well Fluid changed to Crude Oil
1974-01-10 Well Mode changed to Pumping
1974-02-23 Perforation Treatment Performed - Cement Squeeze
1974-02-25 Perforation Treatment Performed - Jet Perforation
1991-01-25 Perforation Treatment Performed - Jet Perforation
1998-11-05 Well Fluid changed to Crude Oil
1998-11-05 Well Mode changed to Suspended
1999-08-01 Well Fluid changed to Crude Oil
1999-08-01 Well Mode changed to Pumping
2004-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-13 Well Fluid changed to Crude Oil
2004-11-13 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-12-20 Perforation 876.30 876.90 13
1973-12-22 Acid Treatment 876.30 876.90 0
1974-02-23 Cement Squeeze 876.30 876.90 0
1974-02-25 Perforation 874.70 875.40 13
1991-01-25 Perforation 873.90 875.40 13
2004-11-13 Packing Device Capped w/Cement 860.00 868.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 6950 0.0 0.0 0.0
1975 8551 0.0 0.0 0.0
1976 8304 0.0 0.0 0.0
1977 8751 0.0 0.0 0.0
1978 5408 0.0 0.0 0.0
1979 7402 0.0 0.0 0.0
1980 6704 0.0 0.0 0.0
1981 8615 0.0 0.0 0.0
1982 8602 0.0 0.0 0.0
1983 7926 0.0 0.0 0.0
1984 8412 0.0 0.0 0.0
1985 8269 0.0 0.0 0.0
1986 8469 0.0 0.0 0.0
1987 8099 0.0 0.0 0.0
1988 8650 0.0 0.0 0.0
1989 8653 0.0 0.0 0.0
1990 8393 0.0 0.0 0.0
1991 7181 0.0 0.0 0.0
1992 8671 0.0 0.0 0.0
1993 8516 0.0 0.0 0.0
1994 8610 0.0 0.0 0.0
1995 8481 0.0 0.0 0.0
1996 8567 0.0 0.0 0.0
1997 2601 0.0 0.0 0.0
1998 6928 0.0 0.0 0.0
1999 3165 0.0 0.0 0.0
2000 8544 0.0 0.0 0.0
2001 7184 0.0 0.0 0.0
2002 4429 0.0 0.0 0.0
2004 19 0.0 0.0 0.0

For data sources see[5]

References