X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102210000

Well Details

Well ID: 0404102210000
Loading map...
Location: 00/10-22-040-10W4/0
Location Alias: 00/10-22-40-10 W4M
Location Alias 2: 00/10-22-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 22
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 10-22-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0038638
License Date: 1970-08-24
License Status: Abandoned
Spud Date: 1970-08-30
Final Drill Date: 1970-09-02
Well Total Depth: 872.90 m
Surface Hole Latitude: 52.457532
Surface Hole Longitude: -111.357367

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-08-24 Obtained License
1970-09-02 Drill Stem Test Performed
1970-09-02 Finished Drilling
1970-09-02 Well Mode changed to Drilled and Cased
1970-09-03 Perforation Treatment Performed - Open-Hole Completion
1970-09-03 Production Casing Operation Performed
1970-09-11 Well Began Production
1970-09-11 Well Fluid changed to Crude Oil
1970-09-11 Well Mode changed to Pumping
1990-12-10 Perforation Treatment Performed - Jet Perforation
1990-12-10 Well Log Performed
1993-06-11 Well Fluid changed to Crude Oil
1993-06-11 Well Mode changed to Suspended
1998-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-27 Perforation Treatment Performed - Jet Perforation
1998-11-27 Perforation Treatment Performed - Remedial Casing
1998-11-27 Plug Back Performed
1998-12-01 Well Abandoned
1998-12-01 Well Fluid changed to Crude Oil
1998-12-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-09-03 Open Hole/Barefoot Completion 870.50 872.90 0
1990-12-10 Perforation 868.10 869.90 14
1998-11-27 Packing Device Capped w/Cement 859.00 859.00 0
1998-11-27 Perforation 164.00 174.00 13
1998-11-27 Remedial Casing Cementing 164.00 174.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 2020 0.0 0.0 0.0
1971 7472 0.0 0.0 0.0
1972 8043 0.0 0.0 0.0
1973 8273 0.0 0.0 0.0
1974 8715 0.0 0.0 0.0
1975 8393 0.0 0.0 0.0
1976 8599 0.0 0.0 0.0
1977 8737 0.0 0.0 0.0
1978 8646 0.0 0.0 0.0
1979 8457 0.0 0.0 0.0
1980 7660 0.0 0.0 0.0
1981 8627 0.0 0.0 0.0
1982 8616 0.0 0.0 0.0
1983 8098 0.0 0.0 0.0
1984 8301 0.0 0.0 0.0
1985 8339 0.0 0.0 0.0
1986 8529 0.0 0.0 0.0
1987 7734 0.0 0.0 0.0
1988 7830 0.0 0.0 0.0
1989 8481 0.0 0.0 0.0
1990 7418 0.0 0.0 0.0
1991 6856 0.0 0.0 0.0
1992 7969 0.0 0.0 0.0
1993 1200 0.0 0.0 0.0

For data sources see[5]

References