X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102209A02

Well Details

Well ID: 0404102209A02
Loading map...
Location: A0/09-22-040-10W4/2
Location Alias: A0/09-22-40-10 W4M
Location Alias 2: A0/09-22-040-10 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 22
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 9-22-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0149175
License Date: 1991-06-19
License Status: Issued
Spud Date: 1991-06-20
Final Drill Date: 1991-06-22
Well Total Depth: 909.00 m
Surface Hole Latitude: 52.457400
Surface Hole Longitude: -111.350499

For data sources see[1][2]

Well History

Date Event
1991-06-19 Obtained License
1991-06-21 Surface Casing Operation Performed
1991-06-22 Finished Drilling
1991-06-22 Well Mode changed to Drilled and Cased
1991-06-23 Well Log Performed
1991-06-24 Production Casing Operation Performed
1991-06-24 Rig Released
1991-07-27 Well Log Performed
1991-08-23 Well Log Performed
1991-08-24 Perforation Treatment Performed - Jet Perforation
2002-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-21 Plug Back Performed
2002-03-21 Well Log Performed
2002-03-23 Perforation Treatment Performed - Jet Perforation
2002-03-23 Well Log Performed
2003-05-29 Well Began Production
2003-05-29 Well Fluid changed to Gas
2003-05-29 Well Mode changed to Flowing
2012-12-19 Perforation Treatment Performed - Cement Squeeze
2013-01-06 Perforation Treatment Performed - Jet Perforation
2013-01-06 Well Log Performed
2013-03-01 Well Fluid changed to Gas
2013-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-08-24 Perforation 876.00 879.50 13
2002-03-21 Packing Device Capped w/Cement 867.00 875.00 0
2002-03-23 Perforation 735.00 740.00 20
2002-03-23 Perforation 740.00 745.00 20
2012-12-19 Cement Squeeze 735.00 745.00 0
2013-01-06 Perforation 876.00 878.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4513 0.0 0.0 0.0
2004 6869 0.0 0.0 0.0
2005 8632 0.0 0.0 0.0
2006 2557 0.0 0.0 0.0
2007 408 0.0 0.0 0.0
2008 5060 0.0 0.0 0.0
2009 4419 0.0 0.0 0.0
2010 6764 0.0 0.0 0.0
2011 2551 0.0 0.0 0.0
2012 7475 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References