X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102206020

Well Details

Well ID: 0404102206020
Loading map...
Location: 02/06-22-040-10W4/0
Location Alias: 02/06-22-40-10 W4M
Location Alias 2: 02/06-22-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 22
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 6-22-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0118218
License Date: 1985-10-08
License Status: Suspension
Spud Date: 1985-10-09
Final Drill Date: 1985-10-12
Well Total Depth: 876.10 m
Surface Hole Latitude: 52.455252
Surface Hole Longitude: -111.361107

For data sources see[1][2]

Well History

Date Event
1985-10-08 Obtained License
1985-10-10 Surface Casing Operation Performed
1985-10-12 Finished Drilling
1985-10-12 Well Mode changed to Drilled and Cased
1985-10-13 Production Casing Operation Performed
1985-10-13 Rig Released
1985-10-13 Well Log Performed
1985-11-01 Perforation Treatment Performed - Open-Hole Completion
1985-11-03 Well Log Performed
1985-11-06 Well Began Production
1985-11-06 Well Fluid changed to Crude Oil
1985-11-06 Well Mode changed to Pumping
1986-11-10 Well Fluid changed to Crude Oil
1986-11-10 Well Mode changed to Suspended
1987-05-06 Well Fluid changed to Crude Oil
1987-05-06 Well Mode changed to Pumping
1987-07-01 Well Fluid changed to Crude Oil
1987-07-01 Well Mode changed to Suspended
1991-03-20 Perforation Treatment Performed - Jet Perforation
1991-03-21 Well Log Performed
1991-03-27 Well Fluid changed to Crude Oil
1991-03-27 Well Mode changed to Pumping
2000-10-01 Well Fluid changed to Crude Oil
2000-10-01 Well Mode changed to Suspended
2004-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-01 Open Hole/Barefoot Completion 875.00 876.10 0
1991-03-20 Perforation 874.00 875.50 14
2004-10-25 Packing Device Capped w/Cement 857.50 865.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1308 0.0 0.0 0.0
1986 5088 0.0 0.0 0.0
1987 172 0.0 0.0 0.0
1988 1008 0.0 0.0 0.0
1990 720 0.0 0.0 0.0
1991 6868 0.0 0.0 0.0
1992 8667 0.0 0.0 0.0
1993 8507 0.0 0.0 0.0
1994 8488 0.0 0.0 0.0
1995 8465 0.0 0.0 0.0
1996 8651 0.0 0.0 0.0
1997 2023 0.0 0.0 0.0
1998 825 0.0 0.0 0.0

For data sources see[5]

References