X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404101516000

Well Details

Well ID: 0404101516000
Loading map...
Location: 00/16-15-040-10W4/0
Location Alias: 00/16-15-40-10 W4M
Location Alias 2: 00/16-15-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 15
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 16-15-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0115435
License Date: 1985-06-18
License Status: Abandoned
Spud Date: 1985-06-19
Final Drill Date: 1985-06-22
Well Total Depth: 953.00 m
Surface Hole Latitude: 52.447278
Surface Hole Longitude: -111.350681

For data sources see[1][2]

Well History

Date Event
1985-06-18 Obtained License
1985-06-20 Surface Casing Operation Performed
1985-06-22 Finished Drilling
1985-06-22 Well Mode changed to Drilled and Cased
1985-06-23 Drill Stem Test Performed
1985-06-23 Well Log Performed
1985-06-24 Production Casing Operation Performed
1985-06-24 Rig Released
1985-07-14 Perforation Treatment Performed - Jet Perforation
1985-07-14 Well Log Performed
1985-07-25 Well Began Production
1985-07-25 Well Fluid changed to Crude Oil
1985-07-25 Well Mode changed to Flowing
1986-10-10 Well Fluid changed to Crude Oil
1986-10-10 Well Mode changed to Suspended
1988-06-28 Well Fluid changed to Crude Oil
1988-06-28 Well Mode changed to Pumping
1991-04-08 Perforation Treatment Performed - Jet Perforation
1991-04-08 Well Log Performed
2010-10-25 Well Fluid changed to Crude Oil
2010-10-25 Well Mode changed to Suspended
2013-03-19 Well Log Performed
2013-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-20 Plug Back Performed
2013-03-20 Well Log Performed
2013-03-22 Perforation Treatment Performed - Jet Perforation
2013-03-22 Well Log Performed
2013-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-23 Perforation Treatment Performed - Remedial Casing
2013-03-23 Plug Back Performed
2013-03-23 Well Fluid changed to Crude Oil
2013-03-23 Well Mode changed to Abandoned Zone
2013-03-28 Well Abandoned
2013-03-28 Well Fluid changed to Crude Oil
2013-03-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-14 Perforation 873.50 874.50 5
1991-04-08 Perforation 873.50 876.00 14
2013-03-20 Packing Device Capped w/Cement 857.00 865.00 0
2013-03-22 Perforation 200.00 201.50 17
2013-03-23 Remedial Casing Cementing 200.00 201.50 0
2013-03-23 Packing Device Capped w/Cement 177.50 198.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3621 0.0 0.0 0.0
1986 5964 0.0 0.0 0.0
1988 3212 0.0 0.0 0.0
1989 2853 0.0 0.0 0.0
1990 6201 0.0 0.0 0.0
1991 6696 0.0 0.0 0.0
1992 8573 0.0 0.0 0.0
1993 8485 0.0 0.0 0.0
1994 8490 0.0 0.0 0.0
1995 7071 0.0 0.0 0.0
1996 8639 0.0 0.0 0.0
1997 8411 0.0 0.0 0.0
1998 8711 0.0 0.0 0.0
1999 8648 0.0 0.0 0.0
2000 8664 0.0 0.0 0.0
2001 7817 0.0 0.0 0.0
2002 8528 0.0 0.0 0.0
2003 2717 0.0 0.0 0.0
2004 19 0.0 0.0 0.0
2005 68 0.0 0.0 0.0
2006 2460 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References