If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404093107003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.483364,"lon":-111.285911,"icon":""}]} |
Location: 00/07-31-040-09W4/3 | |
Location Alias: 00/07-31-40-09 W4M | |
Location Alias 2: 00/07-31-040-09 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 09 | |
Section: 31 | |
County/Municipality: Flagstaff County | |
Well Name: PCP PROVOST 7-31-40-9 | |
Operator Name: Ovintiv Canada ULC | |
License Number: 0059506 | |
License Date: 1976-08-03 | |
License Status: Abandoned | |
Spud Date: 1976-08-15 | |
Final Drill Date: 1976-08-20 | |
Well Total Depth: 951.00 m | |
Surface Hole Latitude: 52.483364 | |
Surface Hole Longitude: -111.285911 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-08-03 | Obtained License |
1976-08-19 | Drill Stem Test Performed |
1976-08-20 | Finished Drilling |
1976-08-20 | Well Mode changed to Drilled and Cased |
1976-08-21 | Drill Stem Test Performed |
1976-08-22 | Drill Stem Test Performed |
1976-08-23 | Production Casing Operation Performed |
1976-10-22 | Perforation Treatment Performed - Jet Perforation |
1997-07-23 | Perforation Treatment Performed - Jet Perforation |
1997-07-23 | Well Log Performed |
1998-07-06 | Well Log Performed |
1998-07-07 | Perforation Treatment Performed - Jet Perforation |
1998-07-07 | Well Log Performed |
1998-07-14 | Well Log Performed |
2000-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-02-01 | Plug Back Performed |
2002-02-11 | Perforation Treatment Performed - Jet Perforation |
2002-02-12 | Well Log Performed |
2002-03-28 | Well Began Production |
2002-03-28 | Well Fluid changed to Gas |
2002-03-28 | Well Mode changed to Flowing |
2005-05-20 | Perforation Treatment Performed - Jet Perforation |
2005-05-20 | Well Log Performed |
2005-05-23 | Perforation Treatment Performed - Fractured |
2005-06-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-06-02 | Well Mode changed to Flowing |
2008-07-05 | Perforation Treatment Performed - Cement Plug |
2008-07-05 | Plug Back Performed |
2008-07-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-07-05 | Well Mode changed to Abandoned Zone |
2008-07-24 | Well Abandoned |
2008-07-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-07-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-10-22 | Perforation | 890.90 | 891.80 | 13 |
2005-05-20 | Perforation | 652.30 | 655.30 | 13 |
2005-05-20 | Perforation | 615.10 | 618.10 | 13 |
2005-05-20 | Perforation | 603.60 | 606.60 | 13 |
2005-05-20 | Perforation | 591.40 | 594.40 | 13 |
2005-05-20 | Perforation | 578.00 | 581.00 | 13 |
2005-05-20 | Perforation | 560.90 | 563.90 | 13 |
2005-05-20 | Perforation | 541.40 | 544.40 | 13 |
2005-05-20 | Perforation | 528.60 | 531.60 | 13 |
2005-05-20 | Perforation | 515.80 | 518.80 | 13 |
2005-05-20 | Perforation | 503.60 | 506.60 | 13 |
1997-07-23 | Perforation | 884.80 | 886.30 | 13 |
2005-05-20 | Perforation | 490.80 | 493.80 | 13 |
2005-05-20 | Perforation | 468.20 | 471.20 | 13 |
2005-05-20 | Perforation | 456.00 | 459.00 | 13 |
2005-05-20 | Perforation | 443.80 | 446.80 | 13 |
2005-05-20 | Perforation | 427.40 | 431.40 | 13 |
2005-05-20 | Perforation | 411.50 | 414.50 | 13 |
2005-05-23 | Fracture | 411.50 | 751.50 | 0 |
2008-07-05 | Cement Plug | 300.00 | 411.00 | 0 |
1998-07-07 | Perforation | 927.50 | 934.50 | 14 |
2000-02-01 | Packing Device Capped w/Cement | 915.00 | 923.00 | 0 |
2000-02-01 | Packing Device Capped w/Cement | 872.00 | 880.00 | 0 |
2002-02-11 | Perforation | 749.50 | 751.50 | 14 |
2005-05-20 | Perforation | 691.30 | 694.30 | 13 |
2005-05-20 | Perforation | 679.80 | 682.80 | 13 |
2005-05-20 | Perforation | 664.50 | 667.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 6519 | 0.0 | 0.0 | 0.0 |
2003 | 7677 | 0.0 | 0.0 | 0.0 |
2004 | 7322 | 0.0 | 0.0 | 0.0 |
2005 | 3935 | 0.0 | 0.0 | 0.0 |
2006 | 3672 | 0.0 | 0.0 | 0.0 |
2007 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]