If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404091813030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.445289,"lon":-111.284069,"icon":""}]} |
Location: 03/13-18-040-09W4/0 | |
Location Alias: 03/13-18-40-09 W4M | |
Location Alias 2: 03/13-18-040-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 09 | |
Section: 18 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB PROVOST 13-18-40-9 | |
Operator Name: Rockeast Energy Corp. | |
License Number: 0395548 | |
License Date: 2008-03-25 | |
License Status: Issued | |
Spud Date: 2008-06-20 | |
Final Drill Date: 2008-06-27 | |
Well Total Depth: 1642.00 m | |
Surface Hole Latitude: 52.445289 | |
Surface Hole Longitude: -111.284069 |
Date | Event |
---|---|
2008-03-25 | Obtained License |
2008-06-20 | Surface Casing Operation Performed |
2008-06-22 | Direction Drilling Operation Performed - Horizontal |
2008-06-25 | Intermediate Casing Operation Performed |
2008-06-25 | Well Log Performed |
2008-06-27 | Finished Drilling |
2008-06-27 | Well Log Performed |
2008-06-27 | Well Mode changed to Drilled and Cased |
2008-06-28 | Liner Casing Operation Performed |
2008-06-29 | Perforation Treatment Performed - Open-Hole Completion |
2008-06-29 | Perforation Treatment Performed - Slotted Liner or Casing |
2008-06-29 | Rig Released |
2008-07-25 | Well Log Performed |
2008-11-07 | Well Began Production |
2008-11-07 | Well Fluid changed to Crude Oil |
2008-11-07 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-06-22 | 665.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-06-29 | Slotted Liner | 1211.00 | 1548.20 | 0 |
2008-06-29 | Open Hole/Barefoot Completion | 1548.20 | 1642.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1209 | 0.0 | 0.0 | 0.0 |
2009 | 8035 | 0.0 | 0.0 | 0.0 |
2010 | 7216 | 0.0 | 0.0 | 0.0 |
2011 | 7550 | 0.0 | 0.0 | 0.0 |
2012 | 8636 | 0.0 | 0.0 | 0.0 |
2013 | 8710 | 0.0 | 0.0 | 0.0 |
2014 | 8247 | 0.0 | 0.0 | 0.0 |
2015 | 8702 | 0.0 | 0.0 | 0.0 |
2016 | 8727 | 0.0 | 0.0 | 0.0 |
2017 | 8722 | 0.0 | 0.0 | 0.0 |
2018 | 8669 | 0.0 | 0.0 | 0.0 |
2019 | 7138 | 0.0 | 0.0 | 0.0 |
2020 | 1145 | 0.0 | 0.0 | 0.0 |
For data sources see[6]