Well Details

Well ID: 0404082312020
Loading map...
Location: 02/12-23-040-08W4/0
Location Alias: 02/12-23-40-08 W4M
Location Alias 2: 02/12-23-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 23
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 12-23-40-8
Operator Name: Cleo Energy Corp.
License Number: 0134564
License Date: 1988-06-27
License Status: Issued
Spud Date: 1988-08-05
Final Drill Date: 1988-08-07
Well Total Depth: 949.80 m
Surface Hole Latitude: 52.459027
Surface Hole Longitude: -111.056473

For data sources see[1][2]

Well History

Date Event
1988-06-27 Obtained License
1988-08-06 Surface Casing Operation Performed
1988-08-07 Finished Drilling
1988-08-07 Well Mode changed to Drilled and Cased
1988-08-08 Production Casing Operation Performed
1988-08-08 Rig Released
1988-08-08 Well Log Performed
1988-08-12 Well Log Performed
1988-08-13 Perforation Treatment Performed - Open-Hole Completion
1988-08-13 Well Log Performed
1988-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-08-14 Perforation Treatment Performed - Remedial Casing
1988-08-14 Perforation Treatment Performed - Selective Jet Perforations
1988-08-14 Well Log Performed
1988-08-15 Perforation Treatment Performed - Jet Perforation
1988-08-25 Well Began Production
1988-08-25 Well Fluid changed to Crude Oil
1988-08-25 Well Mode changed to Pumping
1993-07-03 Well Began Injection
1993-07-03 Well Fluid changed to Water
1993-07-03 Well Type changed to Disposal
1993-08-31 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-08-13 Open Hole/Barefoot Completion 913.00 913.80 0
1988-08-14 Packing Device Capped w/Cement 906.00 910.00 0
1988-08-14 Selective Jet Perforations 445.00 445.00 0
1988-08-14 Remedial Casing Cementing 445.00 445.00 0
1988-08-15 Perforation 892.50 893.50 10
1993-08-31 Open Hole/Barefoot Completion 913.00 949.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 2776 0.0 0.0 0.0
1989 8635 0.0 0.0 0.0
1990 8715 0.0 0.0 0.0
1991 8527 0.0 0.0 0.0
1992 8224 0.0 0.0 0.0
1993 3028 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References