X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404082215000

Well Details

Well ID: 0404082215000
Loading map...
Location: 00/15-22-040-08W4/0
Location Alias: 00/15-22-40-08 W4M
Location Alias 2: 00/15-22-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 22
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 15-22-40-8
Operator Name: Cleo Energy Corp.
License Number: 0133572
License Date: 1988-04-28
License Status: Abandoned
Spud Date: 1988-05-22
Final Drill Date: 1988-05-24
Well Total Depth: 900.00 m
Surface Hole Latitude: 52.462371
Surface Hole Longitude: -111.068096

For data sources see[1][2]

Well History

Date Event
1988-04-28 Obtained License
1988-05-22 Surface Casing Operation Performed
1988-05-24 Finished Drilling
1988-05-24 Well Mode changed to Drilled and Cased
1988-05-25 Production Casing Operation Performed
1988-05-25 Well Log Performed
1988-05-26 Rig Released
1988-06-03 Perforation Treatment Performed - Jet Perforation
1988-06-03 Well Log Performed
1988-06-04 Well Began Production
1988-06-04 Well Fluid changed to Crude Oil
1988-06-04 Well Mode changed to Pumping
1999-05-20 Well Log Performed
1999-05-21 Perforation Treatment Performed - Cement Squeeze
1999-05-25 Perforation Treatment Performed - Jet Perforation
1999-05-25 Well Log Performed
1999-06-03 Well Log Performed
1999-06-06 Well Log Performed
2002-04-17 Perforation Treatment Performed - Jet Perforation
2007-12-20 Well Fluid changed to Crude Oil
2007-12-20 Well Mode changed to Suspended
2012-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-09 Plug Back Performed
2012-06-09 Well Fluid changed to Crude Oil
2012-06-09 Well Mode changed to Abandoned Zone
2012-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-06-03 Perforation 894.00 897.00 13
1999-05-21 Cement Squeeze 894.00 897.00 0
1999-05-25 Perforation 887.00 890.00 13
2002-04-17 Perforation 876.50 878.00 17
2012-06-09 Packing Device Capped w/Cement 875.80 883.80 0
2012-06-10 Packing Device Capped w/Cement 857.00 865.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4435 0.0 0.0 0.0
1989 8198 0.0 0.0 0.0
1990 8513 0.0 0.0 0.0
1991 7938 0.0 0.0 0.0
1992 7967 0.0 0.0 0.0
1993 8430 0.0 0.0 0.0
1994 8162 0.0 0.0 0.0
1995 7297 0.0 0.0 0.0
1996 8177 0.0 0.0 0.0
1997 1628 0.0 0.0 0.0
1999 5085 0.0 0.0 0.0
2000 8556 0.0 0.0 0.0
2001 2392 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-10 No Incident Encountered 0.00 0.00
2012-06-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References