X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404082208060

Well Details

Well ID: 0404082208060
Loading map...
Location: 06/08-22-040-08W4/0
Location Alias: 06/08-22-40-08 W4M
Location Alias 2: 06/08-22-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 22
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 8-22-40-8
Operator Name: Cleo Energy Corp.
License Number: 0177919
License Date: 1995-05-16
License Status: Issued
Spud Date: 1995-06-04
Final Drill Date: 1995-06-06
Well Total Depth: 935.00 m
Surface Hole Latitude: 52.453611
Surface Hole Longitude: -111.063178

For data sources see[1][2]

Well History

Date Event
1995-05-16 Obtained License
1995-06-05 Direction Drilling Operation Performed - Deviate
1995-06-06 Finished Drilling
1995-06-06 Production Casing Operation Performed
1995-06-06 Well Log Performed
1995-06-06 Well Mode changed to Drilled and Cased
1995-06-07 Rig Released
1995-06-12 Well Log Performed
1995-06-15 Perforation Treatment Performed - Jet Perforation
1995-06-15 Well Log Performed
1995-06-29 Well Log Performed
1995-07-10 Well Began Production
1995-07-10 Well Fluid changed to Crude Oil
1995-07-10 Well Mode changed to Pumping
1998-05-20 Perforation Treatment Performed - Cement Squeeze
1998-05-24 Well Log Performed
1998-05-25 Perforation Treatment Performed - Jet Perforation
1998-05-25 Well Log Performed
1998-06-27 Perforation Treatment Performed - Jet Perforation
1998-06-27 Well Log Performed
1998-06-29 Perforation Treatment Performed - Cement Squeeze
2006-12-05 Perforation Treatment Performed - Jet Perforation
2006-12-05 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-06-05 448.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-15 Perforation 898.50 904.00 10
1998-05-20 Cement Squeeze 898.50 904.40 0
1998-05-25 Perforation 905.50 907.00 13
1998-06-27 Perforation 909.70 910.00 7
1998-06-29 Cement Squeeze 909.00 910.00 0
2006-12-05 Perforation 897.50 901.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3864 0.0 0.0 0.0
1996 8437 0.0 0.0 0.0
1997 8106 0.0 0.0 0.0
1998 8209 0.0 0.0 0.0
1999 8629 0.0 0.0 0.0
2000 8584 0.0 0.0 0.0
2001 8251 0.0 0.0 0.0
2002 8582 0.0 0.0 0.0
2003 8634 0.0 0.0 0.0
2004 8549 0.0 0.0 0.0
2005 8634 0.0 0.0 0.0
2006 7613 0.0 0.0 0.0
2007 8342 0.0 0.0 0.0
2008 8382 0.0 0.0 0.0
2009 8556 0.0 0.0 0.0
2010 8091 0.0 0.0 0.0
2011 8715 0.0 0.0 0.0
2012 8544 0.0 0.0 0.0
2013 8396 0.0 0.0 0.0
2014 8431 0.0 0.0 0.0
2015 8625 0.0 0.0 0.0
2016 2485 0.0 0.0 0.0
2017 8393 0.0 0.0 0.0
2018 6814 0.0 0.0 0.0
2019 7938 0.0 0.0 0.0
2020 1503 0.0 0.0 0.0

For data sources see[6]

References