X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404053515002

Well Details

Well ID: 0404053515002
Loading map...
Location: 00/15-35-040-05W4/2
Location Alias: 00/15-35-40-05 W4M
Location Alias 2: 00/15-35-040-05 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 05
Section: 35
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER CZAR 15-35-40-5
Operator Name: Bow River Energy Ltd.
License Number: 0334794
License Date: 2005-07-18
License Status: Suspension
Spud Date: 2005-08-03
Final Drill Date: 2005-08-05
Well Total Depth: 815.00 m
Surface Hole Latitude: 52.491584
Surface Hole Longitude: -110.610352

For data sources see[1][2]

Well History

Date Event
2005-07-18 Obtained License
2005-08-03 Surface Casing Operation Performed
2005-08-04 Direction Drilling Operation Performed - Deviate
2005-08-05 Finished Drilling
2005-08-05 Well Log Performed
2005-08-05 Well Mode changed to Drilled and Cased
2005-08-06 Production Casing Operation Performed
2005-08-06 Rig Released
2005-08-11 Well Log Performed
2005-08-12 Perforation Treatment Performed - Jet Perforation
2005-08-12 Well Log Performed
2007-01-04 Perforation Treatment Performed - Jet Perforation
2007-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-05 Perforation Treatment Performed - Jet Perforation
2007-01-05 Plug Back Performed
2007-01-05 Well Log Performed
2007-01-05 Well Mode changed to Abandoned Zone
2007-05-19 Perforation Treatment Performed - Jet Perforation
2007-05-19 Well Log Performed
2007-09-27 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-08-04 478.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-12 Perforation 791.50 792.00 17
2005-08-12 Perforation 794.00 794.50 17
2007-01-04 Perforation 791.50 792.00 20
2007-01-04 Perforation 794.00 795.00 20
2007-01-05 Packing Device Capped w/Cement 780.00 788.00 0
2007-01-05 Perforation 695.00 696.00 20
2007-01-05 Packing Device Capped w/Cement 684.00 692.00 0
2007-05-19 Perforation 653.00 656.00 17
2007-09-27 Fracture 653.00 656.00 0

For data sources see[5]



References