X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404033415020

Well Details

Well ID: 0404033415020
Loading map...
Location: 02/15-34-040-03W4/0
Location Alias: 02/15-34-40-03 W4M
Location Alias 2: 02/15-34-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 34
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 15-34-40-3
Operator Name: Bow River Energy Ltd.
License Number: 0158328
License Date: 1993-05-17
License Status: Abandoned
Spud Date: 1993-09-13
Final Drill Date: 1993-09-17
Well Total Depth: 862.00 m
Surface Hole Latitude: 52.488271
Surface Hole Longitude: -110.355967

For data sources see[1][2]

Well History

Date Event
1993-05-17 Obtained License
1993-09-14 Surface Casing Operation Performed
1993-09-16 Direction Drilling Operation Performed - Deviate
1993-09-17 Finished Drilling
1993-09-17 Lost Circulation Occurred
1993-09-17 Well Mode changed to Drilled and Cased
1993-09-18 Well Log Performed
1993-09-19 Production Casing Operation Performed
1993-09-19 Rig Released
1993-09-20 Well Log Performed
1993-10-01 Perforation Treatment Performed - Jet Perforation
1993-10-01 Well Log Performed
1993-10-03 Perforation Treatment Performed - Cement Squeeze
1993-10-06 Perforation Treatment Performed - Jet Perforation
1993-10-06 Well Log Performed
1993-10-10 Well Began Production
1993-10-10 Well Fluid changed to Crude Oil
1993-10-10 Well Mode changed to Pumping
1994-09-09 Well Log Performed
1996-04-02 Perforation Treatment Performed - Jet Perforation
1996-04-02 Well Fluid changed to Crude Oil
1996-04-02 Well Mode changed to Suspended
2003-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-27 Perforation Treatment Performed - Cement Squeeze
2003-08-27 Plug Back Performed
2003-08-27 Well Fluid changed to Crude Oil
2003-08-27 Well Mode changed to Abandoned Zone
2004-06-10 Well Log Performed
2013-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-26 Perforation Treatment Performed - Jet Perforation
2013-07-26 Well Log Performed
2013-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-07-28 Perforation Treatment Performed - Remedial Casing
2013-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-31 Perforation Treatment Performed - Jet Perforation
2013-07-31 Well Log Performed
2013-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-02 Perforation Treatment Performed - Remedial Casing
2013-08-29 Well Log Performed
2013-08-30 Perforation Treatment Performed - Jet Perforation
2013-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-02 Perforation Treatment Performed - Remedial Casing
2013-09-19 Well Log Performed
2013-09-23 Perforation Treatment Performed - Jet Perforation
2013-09-23 Well Log Performed
2013-09-24 Perforation Treatment Performed - Remedial Casing
2013-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-26 Plug Back Performed
2014-05-29 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-09-16 552.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-10-01 Perforation 798.50 800.00 18
2013-07-26 Acid Treatment 719.40 722.40 0
2013-07-28 Remedial Casing Cementing 719.40 722.40 0
2013-07-28 Packing Device Capped w/Cement 708.00 718.00 0
2013-07-31 Perforation 406.00 409.00 17
2013-07-31 Perforation 406.00 409.00 20
2013-07-31 Acid Treatment 406.00 409.00 0
2013-08-02 Remedial Casing Cementing 406.00 409.00 0
2013-08-02 Packing Device Capped w/Cement 394.50 404.00 0
2013-08-30 Perforation 314.00 317.00 20
2013-08-30 Perforation 314.00 317.00 17
1993-10-03 Cement Squeeze 798.50 800.00 0
2013-09-01 Acid Treatment 314.00 317.00 0
2013-09-02 Remedial Casing Cementing 314.00 317.00 0
2013-09-02 Packing Device Capped w/Cement 296.00 310.00 0
2013-09-23 Perforation 217.40 220.40 17
2013-09-23 Perforation 217.40 220.40 20
2013-09-24 Remedial Casing Cementing 217.40 220.40 0
2013-09-26 Packing Device Capped w/Cement 205.80 213.80 0
1993-10-06 Perforation 801.50 803.00 17
1996-04-02 Perforation 796.00 799.00 13
2003-08-27 Cement Squeeze 796.00 799.00 0
2003-08-27 Cement Squeeze 801.50 803.00 0
2003-08-27 Packing Device Capped w/Cement 785.50 793.50 0
2013-07-26 Perforation 719.40 722.40 17
2013-07-26 Perforation 719.40 722.40 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1558 0.0 0.0 0.0
1994 7556 0.0 0.0 0.0
1995 8474 0.0 0.0 0.0
1996 2184 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-09-17 Lost Circulation 862.00 862.00
2013-08-06 No Incident Encountered 0.00 0.00
2013-09-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References