X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404032716050

Well Details

Well ID: 0404032716050
Loading map...
Location: 05/16-27-040-03W4/0
Location Alias: 05/16-27-40-03 W4M
Location Alias 2: 05/16-27-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 27
County/Municipality: Municipal District of Provost No. 52
Well Name: COYOTE PROVO 16-27-40-3
Operator Name: Harvest Operations Corp.
License Number: 0205896
License Date: 1997-09-09
License Status: Suspension
Spud Date: 1997-09-13
Final Drill Date: 1997-09-17
Well Total Depth: 831.00 m
Surface Hole Latitude: 52.475281
Surface Hole Longitude: -110.344884

For data sources see[1][2]

Well History

Date Event
1997-09-09 Obtained License
1997-09-14 Surface Casing Operation Performed
1997-09-15 Direction Drilling Operation Performed - Deviate
1997-09-17 Finished Drilling
1997-09-17 Well Log Performed
1997-09-17 Well Mode changed to Drilled and Cased
1997-09-18 Rig Released
1997-10-18 Perforation Treatment Performed - Jet Perforation
1997-10-22 Well Log Performed
1997-10-24 Perforation Treatment Performed - Jet Perforation
1997-10-24 Well Log Performed
1997-10-30 Perforation Treatment Performed - Jet Perforation
1997-10-30 Well Log Performed
1997-12-02 Well Began Production
1997-12-02 Well Fluid changed to Crude Oil
1997-12-02 Well Mode changed to Pumping
2007-12-01 Well Fluid changed to Crude Oil
2007-12-01 Well Mode changed to Suspended
2010-02-27 Perforation Treatment Performed - Jet Perforation
2010-02-27 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-02-27 Plug Back Performed
2010-02-27 Well Fluid changed to Crude Oil
2010-02-27 Well Log Performed
2010-02-27 Well Mode changed to Abandoned Zone
2017-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-04 Plug Back Performed
2019-11-18 Perforation Treatment Performed - Jet Perforation
2019-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-20 Perforation Treatment Performed - Cement Squeeze
2019-11-20 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-09-15 195.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-18 Perforation 796.00 798.00 17
1997-10-24 Perforation 800.00 801.00 20
1997-10-30 Perforation 796.00 797.80 17
2010-02-27 Packing Dev Cpd w/Res-Gyp Cem 791.00 794.00 0
2010-02-27 Perforation 787.30 789.50 17
2017-11-04 Packing Device Capped w/Cement 771.00 779.00 0
2019-11-18 Perforation 251.00 252.00 17
2019-11-20 Cement Squeeze 251.00 252.00 0
2019-11-20 Packing Device Capped w/Cement 221.00 245.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 694 0.0 0.0 0.0
1998 8699 0.0 0.0 0.0
1999 8700 0.0 0.0 0.0
2000 2907 0.0 0.0 0.0
2001 7722 0.0 0.0 0.0
2002 8659 0.0 0.0 0.0
2003 4082 0.0 0.0 0.0
2004 2307 0.0 0.0 0.0
2005 80 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-26 No Incident Encountered 0.00 0.00
2019-11-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References