X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404032709032

Well Details

Well ID: 0404032709032
Loading map...
Location: 03/09-27-040-03W4/2
Location Alias: 03/09-27-40-03 W4M
Location Alias 2: 03/09-27-040-03 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 27
County/Municipality: Municipal District of Provost No. 52
Well Name: COYOTE PROVO 9-27-40-3
Operator Name: Harvest Operations Corp.
License Number: 0206249
License Date: 1997-09-17
License Status: Suspension
Spud Date: 1997-09-29
Final Drill Date: 1997-10-02
Well Total Depth: 803.00 m
Surface Hole Latitude: 52.471208
Surface Hole Longitude: -110.346566

For data sources see[1][2]

Well History

Date Event
1997-09-17 Obtained License
1997-09-30 Surface Casing Operation Performed
1997-10-01 Direction Drilling Operation Performed - Deviate
1997-10-02 Finished Drilling
1997-10-02 Well Mode changed to Drilled and Cased
1997-10-03 Rig Released
1997-10-03 Well Log Performed
1997-10-08 Well Log Performed
1997-11-01 Perforation Treatment Performed - Jet Perforation
1997-11-01 Well Log Performed
2005-04-20 Perforation Treatment Performed - Cement Squeeze
2005-04-22 Perforation Treatment Performed - Jet Perforation
2010-02-24 Perforation Treatment Performed - Jet Perforation
2010-02-25 Perforation Treatment Performed - Casing Patch (Over Perfs)
2019-11-15 Perforation Treatment Performed - Cement Plug
2019-11-15 Perforation Treatment Performed - Cement Squeeze
2019-11-15 Plug Back Performed
2019-11-15 Well Mode changed to Abandoned Zone
2019-11-16 Perforation Treatment Performed - Jet Perforation
2019-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-17 Perforation Treatment Performed - Cement Squeeze
2019-11-17 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-10-01 391.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-01 Perforation 765.90 767.30 17
2019-11-17 Packing Device Capped w/Cement 178.00 202.00 0
2005-04-20 Cement Squeeze 765.90 767.30 0
2005-04-22 Perforation 764.20 765.20 17
2010-02-24 Perforation 774.80 775.90 4
2010-02-25 Casing Patch 764.20 765.20 0
2019-11-15 Cement Squeeze 774.80 775.90 0
2019-11-15 Cement Plug 680.00 791.00 0
2019-11-16 Perforation 207.50 208.50 17
2019-11-17 Cement Squeeze 207.50 208.50 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References