X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404032612020

Well Details

Well ID: 0404032612020
Loading map...
Location: 02/12-26-040-03W4/0
Location Alias: 02/12-26-40-03 W4M
Location Alias 2: 02/12-26-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: COYOTE PROVO 12-26-40-3
Operator Name: Harvest Operations Corp.
License Number: 0103159
License Date: 1983-09-19
License Status: Suspension
Spud Date: 1983-10-04
Final Drill Date: 1983-10-07
Well Total Depth: 826.00 m
Surface Hole Latitude: 52.471589
Surface Hole Longitude: -110.337566

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-05-10 Lost Circulation Occurred
1983-09-19 Obtained License
1983-10-07 Finished Drilling
1983-10-07 Production Casing Operation Performed
1983-10-07 Well Mode changed to Drilled and Cased
1983-10-15 Perforation Treatment Performed - Jet Perforation
1983-11-01 Well Began Production
1983-11-01 Well Fluid changed to Crude Oil
1983-11-01 Well Mode changed to Pumping
1986-05-06 Well Log Performed
1986-05-09 Well Began Injection
1986-05-09 Well Fluid changed to Water
1986-05-09 Well Type changed to Injection
2019-04-01 Well Fluid changed to Water
2019-04-01 Well Mode changed to Suspended
2019-04-01 Well Type changed to Injection
2019-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-09 Plug Back Performed
2019-12-09 Well Fluid changed to Water
2019-12-09 Well Mode changed to Abandoned Zone
2019-12-09 Well Type changed to Injection
2019-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-10 Perforation Treatment Performed - Cement Squeeze
2019-12-10 Perforation Treatment Performed - Jet Perforation
2019-12-10 Plug Back Performed
2019-12-11 Perforation Treatment Performed - Jet Perforation
2019-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-12 Perforation Treatment Performed - Cement Squeeze
2019-12-12 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-15 Perforation 773.00 775.00 13
2019-12-12 Packing Device Capped w/Cement 208.00 216.00 0
1983-10-15 Perforation 773.00 780.00 13
2019-12-09 Packing Device Capped w/Cement 784.00 792.00 0
2019-12-09 Packing Device Capped w/Cement 760.00 768.00 0
2019-12-10 Perforation 263.00 264.00 17
2019-12-10 Cement Squeeze 263.00 264.00 0
2019-12-10 Packing Device Capped w/Cement 243.00 258.00 0
2019-12-11 Perforation 219.00 220.00 17
2019-12-12 Cement Squeeze 219.00 220.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 77 0.0 0.0 0.0
1984 4906 0.0 0.0 0.0
1985 2391 0.0 0.0 0.0
1986 1549 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-05-10 Lost Circulation 82.50 82.50
1986-05-07 No Incident Encountered 0.00 0.00
2019-12-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References