X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404032606000

Well Details

Well ID: 0404032606000
Loading map...
Location: 00/06-26-040-03W4/0
Location Alias: 00/06-26-40-03 W4M
Location Alias 2: 00/06-26-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: COYOTE PROVO 6-26-40-3
Operator Name: Harvest Operations Corp.
License Number: 0057721
License Date: 1976-03-30
License Status: Abandoned
Spud Date: 1976-05-24
Final Drill Date: 1976-05-27
Well Total Depth: 810.80 m
Surface Hole Latitude: 52.468182
Surface Hole Longitude: -110.332289

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-03-30 Obtained License
1976-05-27 Finished Drilling
1976-05-27 Well Mode changed to Drilled and Cased
1976-05-28 Drill Stem Test Performed
1976-05-28 Production Casing Operation Performed
1976-06-03 Perforation Treatment Performed - Jet Perforation
1976-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-29 Well Began Production
1976-07-29 Well Fluid changed to Crude Oil
1976-07-29 Well Mode changed to Pumping
1979-11-08 Perforation Treatment Performed - Jet Perforation
1979-11-08 Perforation Treatment Performed - Remedial Casing
1983-10-10 Perforation Treatment Performed - Cement Squeeze
1983-10-12 Perforation Treatment Performed - Jet Perforation
1983-10-12 Well Fluid changed to Crude Oil
1983-10-12 Well Log Performed
1983-10-12 Well Mode changed to Abandoned Zone
1993-02-01 Perforation Treatment Performed - Cement Squeeze
1993-02-01 Perforation Treatment Performed - Jet Perforation
1993-02-03 Perforation Treatment Performed - Cement Squeeze
1993-02-03 Perforation Treatment Performed - Jet Perforation
1993-02-05 Perforation Treatment Performed - Jet Perforation
1994-09-24 Perforation Treatment Performed - Jet Perforation
1994-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-25 Well Fluid changed to Crude Oil
1994-11-25 Well Mode changed to Pumping
2006-08-01 Well Fluid changed to Crude Oil
2006-08-01 Well Mode changed to Suspended
2014-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-14 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2014-11-14 Plug Back Performed
2014-11-14 Well Fluid changed to Crude Oil
2014-11-14 Well Mode changed to Abandoned Zone
2014-11-15 Well Log Performed
2014-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-17 Perforation Treatment Performed - Cement Plug
2014-11-17 Perforation Treatment Performed - Jet Perforation
2014-11-17 Perforation Treatment Performed - Remedial Casing
2014-11-17 Plug Back Performed
2014-11-17 Well Log Performed
2015-02-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-06-03 Perforation 777.80 779.70 13
1993-02-03 Cement Squeeze 786.80 788.80 0
1993-02-05 Perforation 784.50 785.50 20
1994-09-24 Perforation 778.20 779.20 13
1994-09-25 Acid Treatment 778.20 779.20 0
2014-11-14 Packing Dev Cpd w/Res-Gyp Cem 779.00 782.00 0
2014-11-14 Packing Device Capped w/Cement 765.00 770.20 0
2014-11-17 Perforation 551.00 552.00 13
2014-11-17 Packing Device Capped w/Cement 535.00 543.00 0
2014-11-17 Perforation 284.00 285.00 13
2014-11-17 Packing Device Capped w/Cement 272.00 280.00 0
1976-07-07 Acid Treatment 777.80 779.70 0
2014-11-17 Perforation 186.00 187.00 13
2014-11-17 Remedial Casing Cementing 186.00 187.00 0
2014-11-17 Cement Plug 156.00 187.00 0
2014-11-17 Packing Device Capped w/Cement 765.00 770.20 0
1979-11-08 Perforation 594.70 595.00 13
1979-11-08 Remedial Casing Cementing 594.70 595.00 0
1983-10-10 Cement Squeeze 777.80 779.70 0
1983-10-12 Perforation 784.60 788.80 13
1993-02-01 Perforation 792.00 793.00 13
1993-02-01 Cement Squeeze 792.00 793.00 0
1993-02-03 Perforation 786.80 788.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1627 0.0 0.0 0.0
1977 7797 0.0 0.0 0.0
1978 6851 0.0 0.0 0.0
1979 6594 0.0 0.0 0.0
1980 7320 0.0 0.0 0.0
1981 7567 0.0 0.0 0.0
1982 6094 0.0 0.0 0.0
1983 1230 0.0 0.0 0.0
1994 703 0.0 0.0 0.0
1995 8479 0.0 0.0 0.0
1996 8322 0.0 0.0 0.0
1997 8124 0.0 0.0 0.0
1998 8720 0.0 0.0 0.0
1999 8009 0.0 0.0 0.0
2000 8754 0.0 0.0 0.0
2001 8684 0.0 0.0 0.0
2002 216 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-09-25 No Incident Encountered 0.00 0.00
1994-09-24 No Incident Encountered 0.00 0.00
2014-11-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References