X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031216A00

Well Details

Well ID: 0404031216A00
Loading map...
Location: A0/16-12-040-03W4/0
Location Alias: A0/16-12-40-03 W4M
Location Alias 2: A0/16-12-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 12
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 16-12-40-3
Operator Name: Surge Energy Inc.
License Number: 0136082
License Date: 1988-09-01
License Status: Suspension
Spud Date: 1988-09-02
Final Drill Date: 1988-09-05
Well Total Depth: 877.00 m
Surface Hole Latitude: 52.431460
Surface Hole Longitude: -110.294949

For data sources see[1][2]

Well History

Date Event
1988-09-01 Obtained License
1988-09-03 Lost Circulation Occurred
1988-09-03 Surface Casing Operation Performed
1988-09-05 Finished Drilling
1988-09-05 Well Log Performed
1988-09-06 Production Casing Operation Performed
1988-09-06 Rig Released
1988-09-06 Well Mode changed to Drilled and Cased
1988-10-20 Perforation Treatment Performed - Jet Perforation
1988-10-20 Well Log Performed
1988-12-06 Well Began Production
1988-12-06 Well Fluid changed to Crude Oil
1988-12-06 Well Mode changed to Pumping
1989-02-28 Well Fluid changed to Crude Oil
1989-02-28 Well Mode changed to Suspended
1989-03-21 Well Fluid changed to Crude Oil
1989-03-21 Well Mode changed to Pumping
1992-04-16 Perforation Treatment Performed - Cement Squeeze
1992-04-16 Well Fluid changed to Crude Oil
1992-04-16 Well Mode changed to Abandoned Zone
1992-04-18 Perforation Treatment Performed - Jet Perforation
1992-04-20 Perforation Treatment Performed - Jet Perforation
1992-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-20 Perforation 804.00 805.50 20
1992-04-16 Cement Squeeze 804.00 805.50 0
1992-04-18 Perforation 835.00 840.00 13
1992-04-20 Perforation 825.00 835.00 13
1992-04-21 Acid Treatment 825.00 840.00 0
2008-03-03 Packing Device Capped w/Cement 810.70 818.70 0
2008-03-03 Packing Device Capped w/Cement 785.00 793.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 548 0.0 0.0 0.0
1989 8067 0.0 0.0 0.0
1990 8747 0.0 0.0 0.0
1991 8403 0.0 0.0 0.0
1992 1985 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-09-03 Lost Circulation 184.00 250.00

For data sources see[6]

References