X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031208002

Well Details

Well ID: 0404031208002
Loading map...
Location: 00/08-12-040-03W4/2
Location Alias: 00/08-12-40-03 W4M
Location Alias 2: 00/08-12-040-03 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 12
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 8-12-40-3
Operator Name: Surge Energy Inc.
License Number: 0114067
License Date: 1985-03-21
License Status: Issued
Spud Date: 1985-03-21
Final Drill Date: 1985-03-25
Well Total Depth: 870.00 m
Surface Hole Latitude: 52.425203
Surface Hole Longitude: -110.296727

For data sources see[1][2]

Well History

Date Event
1985-03-21 Obtained License
1985-03-22 Surface Casing Operation Performed
1985-03-25 Drill Stem Test Performed
1985-03-25 Finished Drilling
1985-03-25 Well Log Performed
1985-03-26 Production Casing Operation Performed
1985-03-26 Rig Released
1985-06-18 Well Log Performed
1985-06-20 Perforation Treatment Performed - Jet Perforation
1985-06-20 Well Log Performed
1987-10-15 Perforation Treatment Performed - Jet Perforation
1987-10-15 Well Mode changed to Drilled and Cased
1988-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-02-15 Plug Back Performed
1988-02-15 Well Mode changed to Abandoned Zone
1992-08-11 Perforation Treatment Performed - Cement Squeeze
1992-08-18 Perforation Treatment Performed - Jet Perforation
1992-08-19 Well Began Injection
1992-08-19 Well Fluid changed to Water
1992-08-19 Well Type changed to Disposal
1994-11-08 Perforation Treatment Performed - Jet Perforation
1994-11-08 Well Fluid changed to Water
1994-11-08 Well Type changed to Disposal
1994-11-11 Well Fluid changed to Water
1994-11-11 Well Mode changed to Suspended
1994-11-11 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-20 Perforation 791.50 794.50 13
1987-10-15 Perforation 820.00 830.00 13
1988-02-15 Packing Device Capped w/Cement 806.00 814.00 0
1992-08-11 Cement Squeeze 791.50 794.50 0
1992-08-18 Perforation 820.00 830.00 13
1994-11-08 Perforation 797.50 801.50 15

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References