X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012904B42

Well Details

Well ID: 0404012904B42
Loading map...
Location: B4/04-29-040-01W4/2
Location Alias: B4/04-29-40-01 W4M
Location Alias 2: B4/04-29-040-01 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE B4 HAYTER 4-29-40-1
Operator Name: Harvest Operations Corp.
License Number: 0189154
License Date: 1996-06-28
License Status: Suspension
Spud Date: 1996-08-08
Final Drill Date: 1996-08-10
Well Total Depth: 897.00 m
Surface Hole Latitude: 52.467116
Surface Hole Longitude: -110.121840

For data sources see[1][2]

Well History

Date Event
1996-06-28 Obtained License
1996-08-08 Surface Casing Operation Performed
1996-08-09 Direction Drilling Operation Performed - Deviate
1996-08-10 Finished Drilling
1996-08-10 Well Log Performed
1996-08-10 Well Mode changed to Drilled and Cased
1996-08-11 Production Casing Operation Performed
1996-08-11 Rig Released
1996-08-13 Well Log Performed
1997-05-06 Well Log Performed
1997-05-15 Perforation Treatment Performed - Jet Perforation
1997-05-15 Well Log Performed
1997-05-16 Perforation Treatment Performed - Jet Perforation
1997-05-16 Well Log Performed
2004-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-24 Perforation Treatment Performed - Jet Perforation
2004-03-24 Plug Back Performed
2004-03-31 Perforation Treatment Performed - Fractured
2004-04-03 Well Began Production
2004-04-03 Well Fluid changed to Crude Oil
2004-04-03 Well Mode changed to Pumping
2016-09-13 Well Fluid changed to Crude Oil
2016-09-13 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-08-09 98.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-15 Perforation 860.50 862.00 13
1997-05-15 Perforation 858.00 859.00 13
1997-05-15 Perforation 853.00 855.00 13
1997-05-16 Perforation 863.00 865.00 13
2004-03-24 Packing Device Capped w/Cement 842.00 850.00 0
2004-03-24 Perforation 807.50 810.00 17
2004-03-31 Fracture 807.50 810.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 6321 0.0 0.0 0.0
2005 8384 0.0 0.0 0.0
2006 8583 0.0 0.0 0.0
2007 2827 0.0 0.0 0.0
2008 5176 0.0 0.0 0.0
2009 7766 0.0 0.0 0.0
2010 6574 0.0 0.0 0.0
2011 7273 0.0 0.0 0.0
2012 7082 0.0 0.0 0.0
2013 6585 0.0 0.0 0.0
2014 1233 0.0 0.0 0.0
2015 4597 0.0 0.0 0.0

For data sources see[6]

References