X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012010002

Well Details

Well ID: 0404012010002
Loading map...
Location: 00/10-20-040-01W4/2
Location Alias: 00/10-20-40-01 W4M
Location Alias 2: 00/10-20-040-01 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE 100 HAYTER 10-20-40-1
Operator Name: Harvest Operations Corp.
License Number: 0187085
License Date: 1996-04-02
License Status: Suspension
Spud Date: 1996-04-02
Final Drill Date: 1996-04-06
Well Total Depth: 823.00 m
Surface Hole Latitude: 52.459325
Surface Hole Longitude: -110.111577

For data sources see[1][2]

Well History

Date Event
1996-04-02 Obtained License
1996-04-03 Surface Casing Operation Performed
1996-04-04 Direction Drilling Operation Performed - Deviate
1996-04-06 Finished Drilling
1996-04-06 Well Log Performed
1996-04-06 Well Mode changed to Drilled and Cased
1996-04-07 Production Casing Operation Performed
1996-04-07 Well Log Performed
1996-04-08 Rig Released
1996-04-23 Well Log Performed
1999-12-19 Perforation Treatment Performed - Jet Perforation
1999-12-19 Well Log Performed
1999-12-30 Well Log Performed
2010-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-06 Perforation Treatment Performed - Jet Perforation
2010-06-06 Plug Back Performed
2010-06-06 Well Log Performed
2010-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-08 Plug Back Performed
2010-06-08 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-04-04 316.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-12-19 Perforation 772.00 775.00 20
2010-06-06 Packing Device Capped w/Cement 758.00 768.00 0
2010-06-06 Perforation 730.00 732.00 17
2010-06-08 Packing Device Capped w/Cement 714.00 724.00 0

For data sources see[5]



References