X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395092408000

Well Details

Well ID: 0395092408000
Loading map...
Location: 00/08-24-039-09W5/0
Location Alias: 00/08-24-39-09 W5M
Location Alias 2: 00/08-24-039-09 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 09
Section: 24
County/Municipality: Clearwater County
Well Name: CVE FERRIER 8-24-39-9
Operator Name: Cenovus Energy Inc.
License Number: 0080419
License Date: 1980-01-14
License Status: Suspension
Spud Date: 1980-05-04
Final Drill Date: 1980-06-06
Well Total Depth: 2695.00 m
Surface Hole Latitude: 52.367564
Surface Hole Longitude: -115.158040

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-14 Obtained License
1980-06-06 Finished Drilling
1980-06-06 Well Mode changed to Drilled and Cased
1980-06-08 Drill Stem Test Performed
1980-06-11 Production Casing Operation Performed
1980-08-01 Perforation Treatment Performed - Jet Perforation
1980-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-09 Well Began Production
1980-08-09 Well Fluid changed to Crude Oil
1980-08-09 Well Mode changed to Pumping
1981-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-28 Well Fluid changed to Crude Oil
1983-03-28 Well Mode changed to Suspended
1983-12-28 Well Fluid changed to Crude Oil
1983-12-28 Well Mode changed to Pumping
1989-12-30 Well Fluid changed to Crude Oil
1989-12-30 Well Mode changed to Suspended
2008-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-06 Plug Back Performed
2008-09-06 Well Fluid changed to Crude Oil
2008-09-06 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-01 Perforation 2627.70 2629.00 7
1980-08-01 Perforation 2629.70 2630.50 7
1980-08-06 Acid Treatment 2627.70 2630.50 0
1980-08-07 Acid Treatment 2627.70 2630.50 0
1981-09-10 Acid Treatment 2627.70 2630.50 0
2008-09-06 Packing Device Capped w/Cement 2609.00 2617.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1888 0.0 0.0 0.0
1981 8385 0.0 0.0 0.0
1982 168 0.0 0.0 0.0
1984 7509 0.0 0.0 0.0
1985 8522 0.0 0.0 0.0
1986 8332 0.0 0.0 0.0
1987 7969 0.0 0.0 0.0
1988 8288 0.0 0.0 0.0
1989 5285 0.0 0.0 0.0

For data sources see[5]

References